1. Architectural aluminum formwork connection: simple tools, easy assembly, convenient operation, low technical requirements, tight splicing to avoid slurry leakage and misalignment.
2. Adjustable vertical pole: The adjustment position is in the middle of the vertical pole, which is convenient for operation and can be adjusted roughly and finely.
3. Early dismantling system: the aluminum alloy template can be dismantled first, which improves the turnover rate of the template. Building aluminum template
4. Diagonal bracing: Diagonal bracing can effectively prevent the wall column from shifting during the pouring process. It is fixed on the floor with expansion bolts, which is stable and convenient. The screw device in the middle can effectively adjust the verticality of the wall column.
5. External wall tie: use the gourd iron chain to tie, realize the top-pulling combination, can effectively control the verticality and flatness of the wall column, and the operation is simple and convenient for workers. Building aluminum template
6. Fixing and positioning of wire box and wire tube: The wire box is fixed with an expansion cap, and the water pipe hole is fixed with a screw for easy removal. The wire box and the wire tube are positioned accurately for the first time, and the upper positioning can be consistent.
7. Falling board template: The indented architectural aluminum template is connected by bolts, which is convenient to remove the mold and has a good effect on reducing the damage of the external angle at the falling board.