Flat Tie Building Construction formwork
In terms of construction quality, the flat circular holes at both ends of the tie, the aluminum templates on both sides of the wall are fixed with pins, the length of each flat tie is fixed, so the thickness can be equal, and each nut screw system is avoided due to the degree of tightening. It not only solves the problem of uneven wall thickness, but also improves the vertical quality.
- Fast Delievery
- Quality Assurance
- 24/7 Customer Service
Product Introduction
"Good" :
In terms of construction quality, the flat circular holes at both ends of the tie, the aluminum templates on both sides of the wall are fixed with pins, the length of each flat tie is fixed, so the thickness can be equal, and each nut screw system is avoided due to the degree of tightening. It not only solves the problem of uneven wall thickness, but also improves the vertical quality.
After removing it from the mold, break the flat collar on either side of the exposed wall. The outer wall has no holes and water seepage.






"Fast" :
The fastening method of flat tie rod and screw is different
In terms of installation efficiency, only two horizontal single-pipe square holes are required in the inner wall, with an average weight of approximately 3.5 tons per project. Compared with the screw system with four horizontal double pipes and vertical rear slots, weight can be reduced by more than 70%, and installation, disassembly and transmission labor intensity is low.









Hot Tags: flat tie building construction formwork, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Lightweight Aluminum Formwork, Flat Tie Aluminum Formwork System, Snap Ties Concrete forms, Mold Concrete Steel Concrete forms Ties, Flat Tie Concrete Modular, Flat Tie Building Construction formwork








