
Strong Metal Frame Prefab House Steel Building Steel Structure Workshop
The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.
Product Introduction
We always believe that warm and thoughtful service adds value to the quality of Quick Deck Slab Formwork, Flat Tie Concrete Modular, Hotel Building Aluminum Formwork to gain more customer trust! We honor our core principal of Honesty in business, priority in company and will do our greatest to provide our customers with high-quality goods and fantastic provider. After years of hard work, our company has developed into a modern professional enterprise, which can meet the needs of different customers all over the world. We are driven by sales purposes, all for the sake of front-line sales, and effectively mobilize all-round resources. With the continuous expansion of domestic and foreign trade, the enterprise strives for survival by quality and development by technology.
The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.
Tensile tests are carried out on each batch of high strength manganese steel to ensure that it can withstand a tensile force greater than 28kN.
Flat tie does not need to open holes on the panel, just milling grooves on the side ribs, and connecting the two forms with installation pins at the joint position. After the concrete has set, the aluminum formwork of the wall is removed, leaving a strip with two ends sticking out. Remove and extend the bow tie




Installation drawing

Schematic diagram (3)

It is designed as a v-shaped structure with stress concentration, and the fracture part is 5mm inside the wall, so there is no need to worry about the influence on the subsequent decoration process.


The distance between the base and the ground should not be greater than 200mm. A flat tie layout should be dense and sparse. Both sides are pressed flat with square holes to ensure flatness and hollow rectangular steel tubes.


The outer wall is provided with three square grooves, the third is arranged at the top K plate position. Install a small diagonal brace at the bottom to ensure a vertical installation. Sloping roof, top set wire rope, adjust verticality. Exterior walls are backed to prevent tilting.





Our Strong Metal Frame Prefab House Steel Building Steel Structure Workshop quality is high and quality is good, and all our indexes are qualified. We take a top -of-the-line international technology and adopt the efficient business model, focusing on continuous optimization and innovation of our products. While maintaining performance growth, we also take practical actions to give back to the society and fully implement the responsibility of energy conservation and emission reduction.
Hot Tags: flat tie concrete modular, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Flat Tie Aluminum Formwork System, Flat Tie formwork System, Tie Rod For Formwork, Mold Concrete Steel Concrete forms Ties, Column Construction formwork Mold, Concrete Slab Desk formwork




