Prefabricated Steel Structure Warehouse (BYSS190327)
The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.
Product Introduction
After years of development, we have a solid market position and we can provide customized High Rise Tower Building Formwork, Flat Tie Concrete Modular, High Rise Residential Buildings Formwork to meet the needs of our customers. The company always adheres to the business philosophy of honesty and quality, adheres to the principle of customer first, and earnestly achieves reliable quality. We ensure that every product detail is perfect, and aim to provide customers with cost-effective value-added services.
The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.
Tensile tests are carried out on each batch of high strength manganese steel to ensure that it can withstand a tensile force greater than 28kN.
Flat tie does not need to open holes on the panel, just milling grooves on the side ribs, and connecting the two forms with installation pins at the joint position. After the concrete has set, the aluminum formwork of the wall is removed, leaving a strip with two ends sticking out. Remove and extend the bow tie




Installation drawing

Schematic diagram (3)

It is designed as a v-shaped structure with stress concentration, and the fracture part is 5mm inside the wall, so there is no need to worry about the influence on the subsequent decoration process.


The distance between the base and the ground should not be greater than 200mm. A flat tie layout should be dense and sparse. Both sides are pressed flat with square holes to ensure flatness and hollow rectangular steel tubes.


The outer wall is provided with three square grooves, the third is arranged at the top K plate position. Install a small diagonal brace at the bottom to ensure a vertical installation. Sloping roof, top set wire rope, adjust verticality. Exterior walls are backed to prevent tilting.





We will devote ourselves to R&D and production of Prefabricated Steel Structure Warehouse (BYSS190327) with more advanced technology, more complete functions and superior performance. Our company organizes and formulates the inventory management system and standard, analyzes and evaluates the inventory situation, and continuously optimizes the inventory. We have excellent team, excellent R&D capability, strong platform advantage, diligent plowing, and overcome difficulties.
Hot Tags: flat tie concrete modular, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Residential Buildings Formwork, Wall Panel Aluminum Formwork, Quick Deck Slab Formwork, Pin and Wedge for Formwork, High Rise Tower Building Formwork, Pin and Wedge
You Might Also Like
- 
   China Supply Adjustable Steel Props for Slab Formwor... 
- 
   Innovative Floor Formwork Prop Quick Release Table F... 
- 
   Construction Formwork Material Form Tie Rod 
- 
   Prefabricated Steel Structure Warehouse (BYSS-1112) 
- 
   China Aluminium Concrete Formwork for Wall and Slab 
- 
   Modular Timber Beam Slab Table Formwork System for S... 