
Green Formwork Aluminium Slab Formwork for Flatslab or Beamless Structure
Series Model: 6061-T6 (GB5237-2008 Standard)     
Sheet Thickness:4mm  
Surface Treatment: Hot light body  
Width x Height 100 x 65mm
Product Introduction
We constantly optimize the industrial structure and improve the scientific and technological content of our Wall Panel Aluminum Formwork, Concrete Slab Desk formwork, High Rise Tower Building Formwork, so that we can continue to develop and grow and won a good social reputation. Our enterprise spirit embodies the fine tradition of the enterprise and the spirit of the staff and workers, and reflects the spirit that our company needs to advocate in the future development. Through a large number of cultural and sports activities, we make the cultural concept of the staff team more cohesive. All the employees of the company have high ambitions and are willing to cooperate sincerely with all walks of life in the society to create a harmonious and win-win development path! At the same time, we are also actively integrating R&D resources, exploring industry-university-research cooperation.
Aluminum Formwork End Beam/ Middle Beam Panel (EB, MB)
It is a material linking panels when assembling . End beam is used in the edge of each end and middle beam is assembled in the middle. EB, MB and DPH are constituted to keel frame by joint bar and pins.
The most advantages :
1.Short construction period: A set of formwork can reach one floor in four or five days during normal construction, which greatly saves the management cost of the contractor (the current project under construction in Macau-TN27 public housing construction can reach One floor for three days). this product is a quick-release formwork system.
2.Convenient construction and high efficiency: is simple and convenient to assemble, with an average weight of 30KG/m2. It is completely assembled manually without the assistance of any mechanical equipment (workers usually only need a wrench or a small hammer for construction, which is convenient and quick ), skilled installers can install 20-30 square meters per person per day (Compared with the installation of wood mold: this product requires a small number of people, only 70-80% of the people, at the same time does not need very skilled workers. So it will be easier to recruit installation workers, the cost will be relatively low, just need to carry out a simple training before construction).
Series Model: 6061-T6 (GB5237-2008 Standard)
Sheet Thickness:4mm
Surface Treatment: Hot light body
Width x Height 100 x 65mm
Length: 300~1000mm
Rail Width: 8mm
Talent and innovation are the source of our sustainable development. The group has a professional R&D team for the integrated development of Green Formwork Aluminium Slab Formwork for Flatslab or Beamless Structure production, education and research. Our company strictly abides by international conventions, market regulations, and business norms, and respects different social and cultural customs. Our business tenet is loyalty and dedication, love and dedication, optimistic and enterprising, and abiding by laws and trustworthiness.
Hot Tags: beam panel aluminum formwork, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Easy Disassembly Tunnel Formwork, Residential Buildings Formwork, Struture Decking Concrete Slab, Aluminum Formwork, Quick Deck Slab Formwork, Lightweight Aluminum Formwork
You Might Also Like
- 
   Acrow Slab Table Formwork Construction Scaffolding J... 
- 
   Prefabricated Steel Structure Warehouse (BYSS-021) 
- 
   China Manufacture Recyclable Construction Aluminum S... 
- 
   Adjustable 100 Times Plastic Molds Construction Mold... 
- 
   Concrete Formwork Mold for Circular Column Pillar Wh... 
- 
   D Type Shackle, European Large Dee Type, JIS Dee Typ... 

