Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
The level measurement is based on T.B.M (temporary level base point).
The measurement records shall be archived and kept by the designated supervisor.

Product Introduction

To provide high quality Columns Aluminum Formwork, Flat Tie Building Construction formwork, Snap Ties Concrete forms, reasonable prices and professional services for the industry is our unremitting pursuit. We pay attention to humanistic care and continuously optimize the employee welfare mechanism to make employees feel at home. Our company is in line with the business philosophy of 'consumers, businesses, employees, enterprises are all one family'. Our employees are the founders and creators of our company's success. They not only reflect our business model, but also show the attitude of the entire company.

Level measurement

1) Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.

2) The level measurement is based on T.B.M (temporary level base point).

3) The measurement records shall be archived and kept by the designated supervisor.

4) When measuring, drawing positive (+) or negative (-) on the floor to mark the measurement result is an effective method.

5) Where the elevation along the wall line exceeds the design elevation by 10mm, it should be turned to no more than 10mm. Where the wall line is lower than the reference point, plywood or wood should be used to fill the template to the required level. The corners and low places in the walls must be fully filled.

6) After the concrete is poured, the top of the starting board (K board) outside the flat mold needs to be measured horizontally. The levelness of the starting board (K board) on the outside of the flat mold will cause the structure to deviate from the center line, otherwise the template cannot maintain its sag.

7) In order to facilitate adjustment of the starting board (K board) outside the flat mold after pouring, a 26mm long hole is opened.

8) Same as the level measurement of concrete surface, the measurement records of the starting board (K board) on the periphery of the flat form shall also be archived by the designated supervisor. At the same time, deviation detection should be performed and recorded and archived


Pay off

1). The error of the wall template line should be controlled within 1mm, and a control line should be placed in parallel in the same direction 150mm from the outside of the template line.

2) The stake-out line should pass through the opening, external angle, etc. at least 150mm to facilitate the control of the correct position of the template before pouring.

3) The reference point and the stakeout point are very important, which directly affect the verticality of the wall, and it is strictly forbidden to move or damage them.

Formwork detail 1formwork detail 2

We have a series of Concrete Formwork Mold for Circular Column Pillar Which Is Direct Deal of different prices, styles and specifications, and customers can choose the products that suit them according to different needs. Our production technology is mature, set design, production, sales in one, long-term cooperation, a wide range of customers, interested partners can contact us. We look at the direction of future development, constantly make product updates and iterations, and use technology as the power engine of corporate development.