
Concrete Cement Drain Water Pipe Steel Mould
The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.
Product Introduction
Oriented by user needs, and based on product quality wholeheartedly provide users with quality Flat Tie Building Construction formwork, Pin and Wedge, High Rise Tower Building Formwork products! We grasp the market opportunities, constantly to the depth and breadth of the market development, stabilization and expansion of market share, which is an important guarantee to enhance the company's survival and sustainable development capacity. Through years of development, with excellent product quality, reasonable product structure, professional marketing team, perfect after-sales service, and combined online and offline promotion efforts, our company has gradually established a nationwide marketing network to meet the needs of overseas markets.
The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.
Tensile tests are carried out on each batch of high strength manganese steel to ensure that it can withstand a tensile force greater than 28kN.
Flat tie does not need to open holes on the panel, just milling grooves on the side ribs, and connecting the two forms with installation pins at the joint position. After the concrete has set, the aluminum formwork of the wall is removed, leaving a strip with two ends sticking out. Remove and extend the bow tie




Installation drawing

Schematic diagram (3)

It is designed as a v-shaped structure with stress concentration, and the fracture part is 5mm inside the wall, so there is no need to worry about the influence on the subsequent decoration process.


The distance between the base and the ground should not be greater than 200mm. A flat tie layout should be dense and sparse. Both sides are pressed flat with square holes to ensure flatness and hollow rectangular steel tubes.


The outer wall is provided with three square grooves, the third is arranged at the top K plate position. Install a small diagonal brace at the bottom to ensure a vertical installation. Sloping roof, top set wire rope, adjust verticality. Exterior walls are backed to prevent tilting.





With dependable high-quality method, fantastic standing and ideal purchaser assistance, the series of products produced by our firm are exported to many countries and regions for Concrete Cement Drain Water Pipe Steel Mould. We have been ready to share win-win corporation. With our strong manufacturing technology and scientific and innovative management platform, we closely follow the trend of industry development and continuously launch more environmentally friendly, energy-saving and humanized high-quality products.
Hot Tags: flat tie concrete modular, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Snap Ties Concrete forms, Detached Villa Formwork, High Rise Tower Building Formwork, Aluminium Formwork for Standard Construction, Residential Buildings Formwork, Long Pin for Drop Head
You Might Also Like
- 
   Concrete Formwork Slab Supporting Telescopic Steel S... 
- 
   Innovative Floor Formwork Prop Quick Release Table F... 
- 
   Formwork Accessories 15mm Tie Rod for Construction 
- 
   Prefab Modular Portable ISO Shipping Container Flat ... 
- 
   Prefabricated Steel Structure Warehouse (BYSS190327) 
- 
   Flat Rooftop Free Standing Guardrail with Foldable U... 

