
Prefab Modular Portable ISO Shipping Container Flat Pack Dormitory Camp House
The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.
Product Introduction
Our new technology makes the process parameters more stable and improves the level of Residential Buildings Formwork, Villa Aluminum Formwork System, Table formwork refinement manufacturing more significantly. We accept the diversity of employees' different personalities, cultural backgrounds, values, opinions, etc., and are committed to creating a better workplace environment through integration. The independent innovation ability of an enterprise is not only the competitiveness of the enterprise, but also the powerful guarantee of the overall strength of the enterprise. Please feel free to get in touch with us if you need any further assistance. It is necessary to update the corporate quality management concept at any time and continuously improve the level of technology and quality to survive and develop in the fierce market environment where opportunities and challenges coexist.
The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.
Tensile tests are carried out on each batch of high strength manganese steel to ensure that it can withstand a tensile force greater than 28kN.
Flat tie does not need to open holes on the panel, just milling grooves on the side ribs, and connecting the two forms with installation pins at the joint position. After the concrete has set, the aluminum formwork of the wall is removed, leaving a strip with two ends sticking out. Remove and extend the bow tie




Installation drawing

Schematic diagram (3)

It is designed as a v-shaped structure with stress concentration, and the fracture part is 5mm inside the wall, so there is no need to worry about the influence on the subsequent decoration process.


The distance between the base and the ground should not be greater than 200mm. A flat tie layout should be dense and sparse. Both sides are pressed flat with square holes to ensure flatness and hollow rectangular steel tubes.


The outer wall is provided with three square grooves, the third is arranged at the top K plate position. Install a small diagonal brace at the bottom to ensure a vertical installation. Sloping roof, top set wire rope, adjust verticality. Exterior walls are backed to prevent tilting.





Our far-leading technology research and development platform in the industry has laid a solid foundation for customers to provide high-quality Prefab Modular Portable ISO Shipping Container Flat Pack Dormitory Camp House and services. At the identical time, wholeheartedly welcome new and old prospects to our company to go to and negotiate small business. We are always looking out for the interests of our customers, providing them with excellent service and high quality products, while at the same time constantly innovating and establishing a unified sales system.
Hot Tags: flat tie concrete modular, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Pin and Wedge for Formwork, Table formwork, Tie Rod For Formwork, Townhouse Villa Aluminum Formwork, Column Construction formwork Mold, Slab or Deck Panel Aluminum Formwork
You Might Also Like
- 
   Slab Formwork Support Adjustable Steel Shoring Prop 
- 
   Zolo TF20 Peri Type Table Slab Formwork 
- 
   Tie Rod Thread Rod Used for Aluminum Formwork Access... 
- 
   Formwork Tie Rod Steel Water Stop Metal Casting 
- 
   Lianggong Concrete Cement Pipe Making Steel Moulds f... 
- 
   Modular Timber Beam Slab Table Formwork System for S... 

