What Are The Common Building Templates?
Jun 01, 2021
At present, the main raw materials of common building templates in our lives are: wood templates, steel templates, plastic templates, and aluminum templates.
In fact, every template has its advantages and disadvantages. Today, I will learn about the advantages and disadvantages of various templates from all angles.
Raw materials:
1. Wooden template: relatively light weight, light construction, low cost, but not durable, not environmentally friendly, and the repetitive rate is very low.
2. Steel formwork: It is strong and can be reused, but the weight is relatively heavy, the construction is relatively troublesome, and the cost is extremely high.
3. Plastic template: waterproof, lower cost, more durable than wood template, but not strong enough, prone to quality problems.
4. Aluminum alloy template: aluminum alloy has high strength, is not easy to rust, can be recycled many times, has a long mission, and has a high recycling rate. It is slightly heavier than wooden template but much lighter than steel template, and is easy to construct. , But the cost is relatively high.
The above are the advantages and disadvantages of the 4 common templates, but these are not. There are many invisible advantages and disadvantages such as construction quality. Among them, aluminum template is actually good, because Shaanxi aluminum template has an irreplaceable advantage:
1. Because aluminum alloy is easier to process, it is suitable for various concrete components with complex structure and shape, and the bearing capacity can reach 50KN/㎡.
2. The manual assembly operation is simple and flexible, easy to assemble and disassemble, and the construction is simple. Manual delivery of templates and supports layer by layer by preserving openings reduces labor intensity, increases safety factor, and reduces construction costs and transportation costs.
3. Use one set of aluminum formwork and three sets of supports to implement "early dismantling formwork construction technology" (each layer can reduce the construction period of 1 to 2 days), which greatly saves the cost of employment, reduces formwork materials, increases the number of formwork turnover, and speeds up The construction period was completed.
4. The aluminum formwork has a large single-piece layout, less splicing, high production accuracy, high load-bearing capacity, strong resistance to deformation, and high construction quality. It can almost reach the quality standard of fair-faced concrete construction, without the need for plastering and greasy, reducing the cost of batching. Save decoration and decoration costs. In addition, due to the good construction quality, it can effectively reduce the external wall cracking and water seepage in the later period.







