Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
The level measurement is based on T.B.M (temporary level base point).
The measurement records shall be archived and kept by the designated supervisor.
Product Introduction
We will continue to supply specialized Aluminum Formwork Accessories, Columns Aluminum Formwork, Lightweight Aluminum Formwork and excellent service, customer value maximization and truly become a trusted partner. The company does not forget its original intention, keeps its mission in mind, and continues to build a world-class enterprise with characteristics, high quality, and global competitiveness. The company produces higher quality products at a lower cost. We have a perfect information feedback processing network, and the indicators of products are strictly determined according to the industry standards.
Level measurement
1) Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
2) The level measurement is based on T.B.M (temporary level base point).
3) The measurement records shall be archived and kept by the designated supervisor.
4) When measuring, drawing positive (+) or negative (-) on the floor to mark the measurement result is an effective method.
5) Where the elevation along the wall line exceeds the design elevation by 10mm, it should be turned to no more than 10mm. Where the wall line is lower than the reference point, plywood or wood should be used to fill the template to the required level. The corners and low places in the walls must be fully filled.
6) After the concrete is poured, the top of the starting board (K board) outside the flat mold needs to be measured horizontally. The levelness of the starting board (K board) on the outside of the flat mold will cause the structure to deviate from the center line, otherwise the template cannot maintain its sag.
7) In order to facilitate adjustment of the starting board (K board) outside the flat mold after pouring, a 26mm long hole is opened.
8) Same as the level measurement of concrete surface, the measurement records of the starting board (K board) on the periphery of the flat form shall also be archived by the designated supervisor. At the same time, deviation detection should be performed and recorded and archived
Pay off
1). The error of the wall template line should be controlled within 1mm, and a control line should be placed in parallel in the same direction 150mm from the outside of the template line.
2) The stake-out line should pass through the opening, external angle, etc. at least 150mm to facilitate the control of the correct position of the template before pouring.
3) The reference point and the stakeout point are very important, which directly affect the verticality of the wall, and it is strictly forbidden to move or damage them.


In the future, our company will, as always, sincerely provide you with quality Wholesale New Hollow Plastic Formwork Slab Column Formwork Mould, so that we can work together to create brilliant. Our company's production scale continues to expand, progress, rapid development and is still stable in the industry. We are perfect for every product, meticulous about every detail and treat every customer attentively. Our company continues to improve product quality and optimize after-sales service.
Hot Tags: column construction formwork mold, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Adjustable Prop, Easy Disassembly Tunnel Formwork, Detached Villa Formwork, Aluminum Formwork, Round Column formwork, Column formwork
You Might Also Like
- 
   Building Material Heavy Duty Scaffolding Adjustable ... 
- 
   Flat Tie Aluminum Formwork System 
- 
   Zulin Online Technical Support High Rise Climbing Pr... 
- 
   Aluminum Formwork Building Materials for Factories a... 
- 
   Customize Different Kind of Formwork Accessories 
- 
   Steel Construction Cuplock Frame Ringlock Shoring Pr... 