Note: When the corners of the floor are checked correctly, start to install the floor template. In order to install quickly, install the floor bottom cage first.

Product Introduction

With the development of science and technology and the times, the innovation of product technology is more and more important to the development of enterprises, which is the reason why our company attaches great importance to the innovative design of Pin and Wedge for Formwork, Column formwork, Rod Tie formwork System. Please don't hesitate to contact us now, let's work together for a better tomorrow. We always adhere to the development tenet of "people-oriented, innovation and advancement, and quality first"; adhere to the business philosophy of "quality creates value"; and strive to build a "high-speed, smart, and environmentally friendly" diversified development enterprise. Our company has strong technical force, strict production process and management, and stable product quality.

Concrete Slab Desk Formwork

1. Floor slab installation: work preparation → keel cleaning and connection → floor C slot transfer → floor C slot installation → keel transfer → keel installation → floor slab transfer → floor cleaning and installation → brush release agent → reserved hole Installation → quality and adjustment.


Note: When the corners of the floor are checked correctly, start to install the floor template. In order to install quickly, install the floor bottom cage first. The fixed top of each bottom cage needs to install a single top support, and the floor panels must be placed in parallel one by one. , Use pins to temporarily fix them first, and finally tighten the pins uniformly. After the installation of each unit template is completed, use a level meter to measure its flatness and the installation elevation of the layer. If there is any deviation, it will be corrected by the adjustable support of the template system until the overall flatness and corresponding elevation are achieved. Ten pins must be connected around the bottom plate.


We believe that quality is the life of an enterprise, and our quality goal is to achieve a 100% passing rate of Building Material Heavy Duty Scaffolding Adjustable Steel Prop leaving the factory as well as customer service satisfaction. The company has gathered many industry elites, adhering to the spirit of responsible and responsible enterprise, and striving to become the top enterprise in the industry. Facing the competition in the industry, we have always maintained the business philosophy of 'making first-class products and creating first-class enterprises', constantly innovating technology, updating equipment, and improving ourselves.

Hot Tags: concrete slab desk formwork, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Round Column formwork, Steel Prop for Slab Formwork, Aluminium Shuttering Formwork, Columns Aluminum Formwork, Pin and Wedge for Formwork, Lightweight Aluminum Formwork

You Might Also Like