Note: When the corners of the floor are checked correctly, start to install the floor template. In order to install quickly, install the floor bottom cage first.

Product Introduction

We know that we only thrive if we can guarantee our combined price tag competiveness and top quality advantageous at the same time for Struture Decking Concrete Slab, Villa Aluminum Formwork System, Column formwork. After multiple generations of iterative upgrades, the performance of it has reached very stable with superior accuracy. Relying on rich international trade experience, global sales and service network, and excellent service quality, we will continue to provide customers with all-round, one-stop, and reliable textile engineering system solutions.

Concrete Slab Desk Formwork

1. Floor slab installation: work preparation → keel cleaning and connection → floor C slot transfer → floor C slot installation → keel transfer → keel installation → floor slab transfer → floor cleaning and installation → brush release agent → reserved hole Installation → quality and adjustment.


Note: When the corners of the floor are checked correctly, start to install the floor template. In order to install quickly, install the floor bottom cage first. The fixed top of each bottom cage needs to install a single top support, and the floor panels must be placed in parallel one by one. , Use pins to temporarily fix them first, and finally tighten the pins uniformly. After the installation of each unit template is completed, use a level meter to measure its flatness and the installation elevation of the layer. If there is any deviation, it will be corrected by the adjustable support of the template system until the overall flatness and corresponding elevation are achieved. Ten pins must be connected around the bottom plate.


Each of our Strong Support Formwork System 48/60mm Galvanized / Painted Light/ Heavy Duty Scaffolding Italian/Middle East or German/Spain Shoring Jack Adjustable Steel Prop is very professional and humanized, and can meet the diverse needs of users at any time. We study the needs of our customers and meet and reach their interests, which is the starting and ending point of all our work. Our company has a set of modern machinery and equipment and enterprise scientific management system with our own cultural heritage.