Round Column Formwork Used Concrete Pillar Mold for Sale

Round Column Formwork Used Concrete Pillar Mold for Sale

Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
The level measurement is based on T.B.M (temporary level base point).
The measurement records shall be archived and kept by the designated supervisor.

Product Introduction

We do everything from a high starting point, high standards and strict requirements, aiming at and keeping up with the development of the Pin and Wedge for Formwork, High Rise Residential Buildings Formwork, New House Building Formwork System industry, pursuing excellent quality and surpassing competitors. We have rich technology and process accumulation, and can meet the customer's demand for quality and price differentiation. Integrity, focus, efficiency and innovation are our corporate motto, which has been deeply rooted in the heart of every employee of our company. All products have been exported to many countries all over the world. We have received many customers' consistent high praise and established stable cooperated relationship with them.

Level measurement

1) Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.

2) The level measurement is based on T.B.M (temporary level base point).

3) The measurement records shall be archived and kept by the designated supervisor.

4) When measuring, drawing positive (+) or negative (-) on the floor to mark the measurement result is an effective method.

5) Where the elevation along the wall line exceeds the design elevation by 10mm, it should be turned to no more than 10mm. Where the wall line is lower than the reference point, plywood or wood should be used to fill the template to the required level. The corners and low places in the walls must be fully filled.

6) After the concrete is poured, the top of the starting board (K board) outside the flat mold needs to be measured horizontally. The levelness of the starting board (K board) on the outside of the flat mold will cause the structure to deviate from the center line, otherwise the template cannot maintain its sag.

7) In order to facilitate adjustment of the starting board (K board) outside the flat mold after pouring, a 26mm long hole is opened.

8) Same as the level measurement of concrete surface, the measurement records of the starting board (K board) on the periphery of the flat form shall also be archived by the designated supervisor. At the same time, deviation detection should be performed and recorded and archived


Pay off

1). The error of the wall template line should be controlled within 1mm, and a control line should be placed in parallel in the same direction 150mm from the outside of the template line.

2) The stake-out line should pass through the opening, external angle, etc. at least 150mm to facilitate the control of the correct position of the template before pouring.

3) The reference point and the stakeout point are very important, which directly affect the verticality of the wall, and it is strictly forbidden to move or damage them.

Formwork detail 1formwork detail 2

Our textured design not only helps to improve the practical functions of our Round Column Formwork Used Concrete Pillar Mold for Sale, but also can promote the product the energetic value. We always adhere to continuous innovation and grasp the market demand and development direction. Customer satisfaction improvement is an unavoidable central task in our production and operation activities.

Hot Tags: column construction formwork mold, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Flat Tie Aluminum Formwork System, Aluminum Formwork Accessories, Easy Disassembly Tunnel Formwork, Rod Tie Aluminum Formwork System, Beam Panel Aluminum Formwork, Villa Aluminum Formwork System