
Single-Side Bracket with Steel Prop for Concrete Construction Supporting
In order to speed up the construction progress, save the construction period, and reduce the workload of the tower crane equipment, combined with the actual situation of the project, the beam and floor slab formwork are installed as a whole; the aluminum alloy formwork support system adopts the quick disassembly construction technology; the formwork and its supporting materials are horizontally transferred The use of manual transportation reduces the workload of the tower crane.
Product Introduction
We try for excellence, service the customers', hopes to be the most effective cooperation workforce and dominator company for staff, suppliers and shoppers, realizes price share and ongoing marketing for Factory Promotional Pin and Wedge, Aluminium Formwork for Standard Construction, Aluminium Shuttering Formwork. We regularly organize employees to go out for study and training to improve our comprehensive market competitiveness. Culture is not only the soul of an enterprise, but also the gene of enterprise longevity. Excellent enterprises accumulate excellent culture, and excellent culture makes excellent enterprises. It is our constant pursuit to reward our customers and society with the best products, and it is also the value of our existence in the past, present and future.
In order to speed up the construction progress, save the construction period, and reduce the workload of the tower crane equipment, combined with the actual situation of the project, the beam and floor slab formwork are installed as a whole; the aluminum alloy formwork support system adopts the quick disassembly construction technology; the formwork and its supporting materials are horizontally transferred The use of manual transportation reduces the workload of the tower crane.
The main construction sequence is as follows: leveling the structure, brushing the formwork release agent, formwork line-out, installation, positioning, straightening, beam and slab formwork installation; beam and slab formwork removal after concrete pouring; manual transfer to the next bid section through the loading port.
Aluminum alloy template installation
Acceptance and placement of aluminum alloy formwork materials.
1) After unloading, the template must be stacked according to specifications and dimensions. Divide the templates into a pile of 25 and place them on a shelf or pallet.
2) The templates should be stacked neatly according to the number for easy identification.
3). When stacking templates, make sure that the first template board at the bottom faces upwards.
4) All components such as pins, wedges, wall mold connectors, and special tools should be properly stored and distributed when needed.


Our company adheres to the route of high quality and medium price to provide our customers with high quality Single-Side Bracket with Steel Prop for Concrete Construction Supporting. The products provided by the company provide a wealth of products for users in the industry and meet the comprehensive needs of users. Presently, we're wanting forward to even higher cooperation with abroad shoppers depending on mutual rewards.
Hot Tags: easy disassembly tunnel formwork, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Column Concrete Mold Formwork, Hotel Building Aluminum Formwork, Wall Panel Aluminum Formwork, Aluminium Formwork for Standard Construction, Beam Panel Aluminum Formwork, Aluminium Shuttering Formwork
You Might Also Like
- 
   Factory Supplier High Turnover Frequency Concrete Wa... 
- 
   Adjustable Constrution Material Steel Shoring Prop w... 
- 
   Aluminium Formwor Stub Pin and Wedge 
- 
   Experienced Building Construction Galvanized Ringloc... 
- 
   Tecon Customized Wall/Column Formwork with Excellent... 
- 
   Multi- Storey Light Steel Frame Building 

