Q235/Q345 Base Steel Shoring Tower for Heavy Load Project

Q235/Q345 Base Steel Shoring Tower for Heavy Load Project

The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).

Product Introduction

In addition to the Pin and Wedge for Formwork, Snap Ties Concrete forms, Easy Disassembly Tunnel Formwork itself, we also have a reputation for high quality and efficiency in after-sales service and after-maintenance. We dare to break through the boundaries of thinking and traditional experience, and constantly seek new development ideas and methods. The company has been actively advocating the enterprise spirit of "forge ahead, keep improving, keep promises, explore and seek innovation", taking the market as the guide, science and technology as the leader, and establishing a relatively complete quality assurance system.

1. Strong overall stability

The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).


2. Early demolition technology, flexible and fast construction

Incorporating early disassembly techniques into the design reduces material and construction costs. Each building on site uses a master formwork system, three sets of floor supports and three sets of beam supports (four sets of cantilever structure), and the construction speed of one floor can be up to five days. When the concrete strength of this layer reaches the required level, it is removed and transferred to the upper layer. A support system (including heads and rods removed earlier) at the bottom of the floor and beams was used on each of the four floors to ensure design strength was achieved, which was then removed and used on the upper floors.


3. Factory construction is faster

Realize factory construction. In the project preparation stage, the manufacturer carries out in-depth design according to the construction drawing, and then sends it to the construction site after trial assembly in the factory. All possible problems are solved in advance, greatly improving speed and accuracy.


We strive to enhance the comprehensive strength of the enterprise, forming the trend of excellent talents in the Q235/Q345 Base Steel Shoring Tower for Heavy Load Project industry. It is the basic principle of our product design to let users operate simply and use with confidence. Respecting talents, putting people first, and attracting and gathering outstanding talents are the important pillars for us to achieve our business goals.

Hot Tags: rod tie aluminum formwork system, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Adjustable Prop, Rod Tie formwork System, Aluminum Formwork, Struture Decking Concrete Slab, Long Pin for Drop Head, Aluminium Shuttering Formwork

You Might Also Like