Zulin Timber Beam Wall Formwork for Core Wall and Column

Zulin Timber Beam Wall Formwork for Core Wall and Column

The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).

Product Introduction

Our company adopts the world's leading production technology and strict quality management and high-precision testing equipment, so as to ensure the continuity and stability of the quality of all Snap Ties Concrete forms, Aluminum Formwork, Pin and Wedge for Formwork. Our business philosophy is one of long-term planning, foresight and continuous development. Ensuring the healthy development of the enterprise and realizing the value preservation and appreciation of assets is the focus of our work. After years of cooperation in the Chinese market, we have established friendly, long-term and stable business and technical cooperation relationships with many professional scientific research equipment manufacturers, and have become an irreplaceable bridge between manufacturers and users.

1. Strong overall stability

The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).


2. Early demolition technology, flexible and fast construction

Incorporating early disassembly techniques into the design reduces material and construction costs. Each building on site uses a master formwork system, three sets of floor supports and three sets of beam supports (four sets of cantilever structure), and the construction speed of one floor can be up to five days. When the concrete strength of this layer reaches the required level, it is removed and transferred to the upper layer. A support system (including heads and rods removed earlier) at the bottom of the floor and beams was used on each of the four floors to ensure design strength was achieved, which was then removed and used on the upper floors.


3. Factory construction is faster

Realize factory construction. In the project preparation stage, the manufacturer carries out in-depth design according to the construction drawing, and then sends it to the construction site after trial assembly in the factory. All possible problems are solved in advance, greatly improving speed and accuracy.


Our comprehensive quality system and service system ensures the reliability of every Zulin Timber Beam Wall Formwork for Core Wall and Column, so that our customers do not have to worry about anything. We always continually offer you by far the most conscientious customer service, and the widest variety of designs and styles with finest materials. Relying on superior quality and excellent post-sales, our products sell well in both domestic and foreign markets.

Hot Tags: rod tie aluminum formwork system, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Snap Ties Concrete forms, Pin and Wedge, Slab Table formwork, High Rise Residential Buildings Formwork, Lightweight Aluminum Formwork, Villa Aluminum Formwork System

You Might Also Like