
Prefabricated Steel Structure Warehouse (BYSS-014)
The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.
Product Introduction
We will continue to develop market space with the most sophisticated Concrete Slab Desk formwork, Mold Concrete Steel Concrete forms Ties, Aluminium Formwork for Standard Construction and perfect after-sales service, and strive to become the most professional and leading company in this field! We work closely with strategic suppliers to meet our customers' needs for mass production in the shortest possible time, while ensuring that our products are customized to meet their needs. Based on the enterprise concept of 'honesty, trustworthiness, professionalism and innovation', we strive for development with technology, survive with quality, serve every customer and devote ourselves to every product.
The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.
Tensile tests are carried out on each batch of high strength manganese steel to ensure that it can withstand a tensile force greater than 28kN.
Flat tie does not need to open holes on the panel, just milling grooves on the side ribs, and connecting the two forms with installation pins at the joint position. After the concrete has set, the aluminum formwork of the wall is removed, leaving a strip with two ends sticking out. Remove and extend the bow tie




Installation drawing

Schematic diagram (3)

It is designed as a v-shaped structure with stress concentration, and the fracture part is 5mm inside the wall, so there is no need to worry about the influence on the subsequent decoration process.


The distance between the base and the ground should not be greater than 200mm. A flat tie layout should be dense and sparse. Both sides are pressed flat with square holes to ensure flatness and hollow rectangular steel tubes.


The outer wall is provided with three square grooves, the third is arranged at the top K plate position. Install a small diagonal brace at the bottom to ensure a vertical installation. Sloping roof, top set wire rope, adjust verticality. Exterior walls are backed to prevent tilting.





Our company will keep the aim of seeking progress with science and technology and develop better and better Prefabricated Steel Structure Warehouse (BYSS-014) to meet the needs of customers. The company adopts a modern management concept and gradually ascends to a global competitive platform. Ensure the stability of product quality and the improvement of service, do our best to provide customers with quality products and perfect service.
Hot Tags: flat tie concrete modular, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Adjustable Prop, Struture Decking Concrete Slab, Formwork Accessory for Casting Construction, Tie Rod For Formwork, Pin and Wedge for Formwork, Aluminium Formwork for Standard Construction





