Lianggong Modular Plastic Formwork Panels Steel Flat Formwork for Slab

Lianggong Modular Plastic Formwork Panels Steel Flat Formwork for Slab

The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.

Product Introduction

We recognize that improved production methods must continually replace obsolete production methods if we are to have better Villa Aluminum Formwork, Aluminium Shuttering Formwork, Villa Aluminum Formwork System that meet new demands. In terms of new technologies to meet the needs of the future, our team of technical professionals continues to provide comprehensive support for product development and business activities with a forward-looking perspective. Our people-oriented and technology-oriented business philosophy has won us a certain scale and reputation in the industry. In order to better control the quality of products, the stable connection of production and the delivery time, we have realized the whole process of production from raw materials to finished products. Quality management is the foundation of an enterprise's sustainable development.

The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.

Tensile tests are carried out on each batch of high strength manganese steel to ensure that it can withstand a tensile force greater than 28kN.

Flat tie does not need to open holes on the panel, just milling grooves on the side ribs, and connecting the two forms with installation pins at the joint position. After the concrete has set, the aluminum formwork of the wall is removed, leaving a strip with two ends sticking out. Remove and extend the bow tie

123

Installation drawing

234

Schematic diagram (3)

unnamed

It is designed as a v-shaped structure with stress concentration, and the fracture part is 5mm inside the wall, so there is no need to worry about the influence on the subsequent decoration process.

_

The distance between the base and the ground should not be greater than 200mm. A flat tie layout should be dense and sparse. Both sides are pressed flat with square holes to ensure flatness and hollow rectangular steel tubes.

56

The outer wall is provided with three square grooves, the third is arranged at the top K plate position. Install a small diagonal brace at the bottom to ensure a vertical installation. Sloping roof, top set wire rope, adjust verticality. Exterior walls are backed to prevent tilting.

871 2 3 4

Looking ahead, we take the pursuit of producing higher quality Lianggong Modular Plastic Formwork Panels Steel Flat Formwork for Slab as our corporate culture philosophy. We adhere to the concept of people-oriented, equality and justice, unity and cooperation, openness and inclusiveness. We keep track of new developments in the industry, and understand and absorb new technologies.

Hot Tags: flat tie concrete modular, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Aluminum Formwork System, New House Building Formwork System, Pin and Wedge for Formwork, Villa Aluminum Formwork, Slab or Deck Panel Aluminum Formwork, Beam Panel Aluminum Formwork

You Might Also Like