
L Bolt, Formwork Accessories, Bolt, Pipe Sleeve, Plastic Cone, P Cone, D Cone, Plastic ...
In terms of construction quality, the flat circular holes at both ends of the tie, the aluminum templates on both sides of the wall are fixed with pins, the length of each flat tie is fixed, so the thickness can be equal, and each nut screw system is avoided due to the degree of tightening. It not only solves the problem of uneven wall thickness, but also improves the vertical quality.
Product Introduction
We believe that with our expert management means and specialized service concept, we can provide customers with more quality Aluminum Formwork, Villa Aluminum Formwork, Snap Ties Concrete forms and service. We adhere to the mission of 'making products intelligent and service intimate'. In order to build a world-class company, we manage our company in a serious and responsible manner to achieve sustainable development.
"Good" :
In terms of construction quality, the flat circular holes at both ends of the tie, the aluminum templates on both sides of the wall are fixed with pins, the length of each flat tie is fixed, so the thickness can be equal, and each nut screw system is avoided due to the degree of tightening. It not only solves the problem of uneven wall thickness, but also improves the vertical quality.
After removing it from the mold, break the flat collar on either side of the exposed wall. The outer wall has no holes and water seepage.






"Fast" :
The fastening method of flat tie rod and screw is different
In terms of installation efficiency, only two horizontal single-pipe square holes are required in the inner wall, with an average weight of approximately 3.5 tons per project. Compared with the screw system with four horizontal double pipes and vertical rear slots, weight can be reduced by more than 70%, and installation, disassembly and transmission labor intensity is low.









We uphold a consistent level of professionalism, quality, credibility and repair for L Bolt, Formwork Accessories, Bolt, Pipe Sleeve, Plastic Cone, P Cone, D Cone, Plastic .... Our company always adheres to the enterprise policy of 'bigger, better and stronger' and the business principle of 'customer first, treat people with sincerity'. The company attaches great importance to basic management work such as product quality management and production safety management, and has passed strict inspections on products.
Hot Tags: flat tie building construction formwork, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Easy Disassembly Tunnel Formwork, Slab Table formwork, Rod Tie formwork System, Column Concrete Mold Formwork, Aluminum Formwork System, Tie Rod For Formwork
You Might Also Like
- 
   Materials Slab Table Formwork for Building Anchor Nu... 
- 
   Foldable Upright Self Support Guardrail of The Fall ... 
- 
   High Quality Construction Flat Tie Concrete Formwork... 
- 
   Customized Strong Slab Panel Aluminum Aluminum Formw... 
- 
   Stud Pin Wedge Pin Round Pin Small Pin Long Pin 16X5... 
- 
   Prefabricated Steel Structure Section Frame Beam Off... 

