Affordable Prefab Modular Building Steel Structure Frame Villa Prefabricated House

Affordable Prefab Modular Building Steel Structure Frame Villa Prefabricated House

The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.

Product Introduction

With concerted efforts and determination, the company has achieved rapid, healthy and stable development since its establishment, and has quickly risen to become a star enterprise in the Rod Tie formwork System, Townhouse Villa Aluminum Formwork, Slab Table formwork industry in the region and even in the country. At present, we are adhering to the corporate purpose of pursuing excellence and contributing to society, and firmly developing our main business. Quality is our life, reputation is our foundation, and service is our cornerstone! Established good business relations using the Zimbabwe buyer inside the business, we've got established own brand and reputation. Bring customers a more convenient and comfortable shopping experience. Let the company and customers produce a more sincere and more harmonious way of cooperation, so as to create a better cooperation and win-win situation.

The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.

Tensile tests are carried out on each batch of high strength manganese steel to ensure that it can withstand a tensile force greater than 28kN.

Flat tie does not need to open holes on the panel, just milling grooves on the side ribs, and connecting the two forms with installation pins at the joint position. After the concrete has set, the aluminum formwork of the wall is removed, leaving a strip with two ends sticking out. Remove and extend the bow tie

123

Installation drawing

234

Schematic diagram (3)

unnamed

It is designed as a v-shaped structure with stress concentration, and the fracture part is 5mm inside the wall, so there is no need to worry about the influence on the subsequent decoration process.

_

The distance between the base and the ground should not be greater than 200mm. A flat tie layout should be dense and sparse. Both sides are pressed flat with square holes to ensure flatness and hollow rectangular steel tubes.

56

The outer wall is provided with three square grooves, the third is arranged at the top K plate position. Install a small diagonal brace at the bottom to ensure a vertical installation. Sloping roof, top set wire rope, adjust verticality. Exterior walls are backed to prevent tilting.

871 2 3 4

With our excellent production capacity and outstanding quality assurance ability, we have become the leader in the same Affordable Prefab Modular Building Steel Structure Frame Villa Prefabricated House industry. We combine advanced information technology, management methods and enterprise experience at home and abroad with concrete reality to improve management level and production capacity, so that the enterprise can always maintain rapid and stable development in the fierce market competition. In order to achieve excellence, we respect and rely on each other with all colleagues and other partners.

Hot Tags: flat tie concrete modular, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Villa Aluminum Formwork System, Quick Deck Slab Formwork, Townhouse Villa Aluminum Formwork, Hotel Building Aluminum Formwork, Residential Buildings Formwork, Steel Prop for Slab Formwork

You Might Also Like