Injection Plastic Concrete Formwork Mould

Injection Plastic Concrete Formwork Mould

Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
The level measurement is based on T.B.M (temporary level base point).
The measurement records shall be archived and kept by the designated supervisor.

Product Introduction

All kinds of Aluminium Formwork for Standard Construction, Residential Buildings Formwork, Pin and Wedge for Formwork produced by our company have reached the national standards. If we are fortunate to be a supplier or are being selected, you will find our advantages in terms of products, prices, delivery, services, etc., and sincerely hope to be your long-term partners and friends. We are committed to strengthening our enterprise and serving our country, and we are brave enough to take up our responsibilities as an enterprise. With strong economic strength and good business reputation, our company has won the trust of many customers and won a good reputation in the industry. Our company keeps enough sense of crisis in the challenging and severe market competition.

Level measurement

1) Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.

2) The level measurement is based on T.B.M (temporary level base point).

3) The measurement records shall be archived and kept by the designated supervisor.

4) When measuring, drawing positive (+) or negative (-) on the floor to mark the measurement result is an effective method.

5) Where the elevation along the wall line exceeds the design elevation by 10mm, it should be turned to no more than 10mm. Where the wall line is lower than the reference point, plywood or wood should be used to fill the template to the required level. The corners and low places in the walls must be fully filled.

6) After the concrete is poured, the top of the starting board (K board) outside the flat mold needs to be measured horizontally. The levelness of the starting board (K board) on the outside of the flat mold will cause the structure to deviate from the center line, otherwise the template cannot maintain its sag.

7) In order to facilitate adjustment of the starting board (K board) outside the flat mold after pouring, a 26mm long hole is opened.

8) Same as the level measurement of concrete surface, the measurement records of the starting board (K board) on the periphery of the flat form shall also be archived by the designated supervisor. At the same time, deviation detection should be performed and recorded and archived


Pay off

1). The error of the wall template line should be controlled within 1mm, and a control line should be placed in parallel in the same direction 150mm from the outside of the template line.

2) The stake-out line should pass through the opening, external angle, etc. at least 150mm to facilitate the control of the correct position of the template before pouring.

3) The reference point and the stakeout point are very important, which directly affect the verticality of the wall, and it is strictly forbidden to move or damage them.

Formwork detail 1formwork detail 2

Here we solemnly promise that our Injection Plastic Concrete Formwork Mould and production process are in full compliance with relevant international and national laws and regulations. All of our employees are trained in professional skills and educated in professional qualities. Our company will continue to uphold the enterprise spirit of 'high quality and efficiency, honest service, continuous innovation, and always strive for first-class', adhere to the scientific development concept, and provide a wider range of higher-quality products and services to customers at home and abroad.

Hot Tags: column construction formwork mold, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Rod Tie formwork System, New House Building Formwork System, Villa Aluminum Formwork, Flat Tie Concrete Modular, Rod Tie Aluminum Formwork System, Aluminum Formwork System