Adjustable Steel Prop 1.8-3.2m Scaffolding Prop Used for Aluminum Formwork Construction

Adjustable Steel Prop 1.8-3.2m Scaffolding Prop Used for Aluminum Formwork Construction

Note: When the corners of the floor are checked correctly, start to install the floor template. In order to install quickly, install the floor bottom cage first.

Product Introduction

We hire a professional technical team with high wages to ensure the quality of the Column Concrete Mold Formwork, Townhouse Villa Aluminum Formwork, Column formwork and fast improvements. We adhere to the principle of 'your demand is our pursuit, and your recognition is our honor', and strive to provide the most professional service for new and old customers and friends. Our company always insists on leading technology, innovation and practicality, and never stops developing more excellent products.

Concrete Slab Desk Formwork

1. Floor slab installation: work preparation → keel cleaning and connection → floor C slot transfer → floor C slot installation → keel transfer → keel installation → floor slab transfer → floor cleaning and installation → brush release agent → reserved hole Installation → quality and adjustment.


Note: When the corners of the floor are checked correctly, start to install the floor template. In order to install quickly, install the floor bottom cage first. The fixed top of each bottom cage needs to install a single top support, and the floor panels must be placed in parallel one by one. , Use pins to temporarily fix them first, and finally tighten the pins uniformly. After the installation of each unit template is completed, use a level meter to measure its flatness and the installation elevation of the layer. If there is any deviation, it will be corrected by the adjustable support of the template system until the overall flatness and corresponding elevation are achieved. Ten pins must be connected around the bottom plate.


Our company has realized product serialization, production scale and operation branding, and is one of the influential and strong enterprises in the Adjustable Steel Prop 1.8-3.2m Scaffolding Prop Used for Aluminum Formwork Construction industry. We always regard technology as the first engine of future development and promote technology development strategy in depth. Our company adheres to realistic innovation, we proceed from reality, take science and technology as the guide, and constantly innovate.

Hot Tags: concrete slab desk formwork, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Long Pin for Drop Head, Flat Tie formwork System, Hotel Building Aluminum Formwork, Beam Panel Aluminum Formwork, Slab Table formwork, Residential Buildings Formwork

You Might Also Like