915*1830mm 11-13kg 15mm PP Hollow Recycled Usage Building Formwork
In order to speed up the construction progress, save the construction period, and reduce the workload of the tower crane equipment, combined with the actual situation of the project, the beam and floor slab formwork are installed as a whole; the aluminum alloy formwork support system adopts the quick disassembly construction technology; the formwork and its supporting materials are horizontally transferred The use of manual transportation reduces the workload of the tower crane.
Product Introduction
Our company adopts advanced mechanized manufacturing technology to produce Quick Deck Slab Formwork, High Rise Residential Buildings Formwork, Slab Table formwork, which embodies our idea of advancing with the times. Each product is the perfect crystallization of contemporary advanced technology and classical craftsmanship. Our company adheres to the spirit of 'pragmatism, innovation and development' to provide customers with high quality service. We hope to cooperate with a lot more close friends from all over the world. We are a team player with excellence across global boundaries and business fields.
In order to speed up the construction progress, save the construction period, and reduce the workload of the tower crane equipment, combined with the actual situation of the project, the beam and floor slab formwork are installed as a whole; the aluminum alloy formwork support system adopts the quick disassembly construction technology; the formwork and its supporting materials are horizontally transferred The use of manual transportation reduces the workload of the tower crane.
The main construction sequence is as follows: leveling the structure, brushing the formwork release agent, formwork line-out, installation, positioning, straightening, beam and slab formwork installation; beam and slab formwork removal after concrete pouring; manual transfer to the next bid section through the loading port.
Aluminum alloy template installation
Acceptance and placement of aluminum alloy formwork materials.
1) After unloading, the template must be stacked according to specifications and dimensions. Divide the templates into a pile of 25 and place them on a shelf or pallet.
2) The templates should be stacked neatly according to the number for easy identification.
3). When stacking templates, make sure that the first template board at the bottom faces upwards.
4) All components such as pins, wedges, wall mold connectors, and special tools should be properly stored and distributed when needed.


Our 915*1830mm 11-13kg 15mm PP Hollow Recycled Usage Building Formwork does have good quality and every product is strictly inspected to be purchased and used with confidence. The company has implemented corporate culture integration, corporate culture innovation, corporate culture seminars, and initially formed a corporate culture framework with the characteristics of the enterprise. The company has accumulated many years of industry experience and is forward-looking for the future development trend of the industry to drive the company's sustainable development.
Hot Tags: easy disassembly tunnel formwork, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Villa Aluminum Formwork, Quick Deck Slab Formwork, Column formwork, Concrete Slab Desk formwork, Snap Ties Concrete forms, Flat Tie Building Construction formwork
You Might Also Like
- 
   Prefabricated Steel Structure Warehouse (BYSS-1112) 
- 
   Building Material Concrete Plastic Mold Wall Formwork 
- 
   Concrete Round Column or Flat Wall and Column Steel ... 
- 
   Black Standard Curved Wedge with Straight Pin for Al... 
- 
   High Rise Construction of Extrusion Aluminium Formwo... 
- 
   Stainless Steels Clevis Pin Drop Nose Pin 