Let me tell you the process principle of aluminum alloy template
Sep 01, 2021
Process principle of aluminum alloy template
Process flow: measuring line → wall column reinforcement binding → reserved pre-embedding → shade project acceptance → wall aluminum alloy formwork device → beam plate aluminum formwork device → aluminum alloy formwork correction and reinforcement → beam plate steel reinforcement binding → reserved pre-embedding → Shading project acceptance→concrete pouring and maintenance→aluminum formwork removal→aluminum formwork reverse transportation.
The process principle of aluminum alloy formwork; the aluminum formwork system is based on project construction and structural construction drawings, after finalized planning and industrialized processing to customize the required specification-size aluminum formwork structural parts and non-standard parts used in practical engineering.
First, complete the pre-assembly in the factory according to the aluminum template planning drawings, and after meeting the engineering requirements, make corresponding symbols for the partition and unit classification of all template components. The aluminum alloy template material is transported to the site, and the separation device is "checked in" according to the template number. After the device is in place, the verticality of the template is adjusted by the adjustable inclined support, and the horizontal elevation of the template is adjusted by the vertical adjustable support; the through-wall pair of pull screws and backing are used to ensure the rigidity and overall stability of the template system. After the concrete strength reaches the demoulding strength, the vertical supports are preserved, and the wall formwork, beam side formwork and floor formwork are removed in order, and the next layer of cyclic construction is quickly entered.