Equipment maintenance methods for aluminum alloy template manufacturers
Feb 01, 2021
Line perforation, washing and inspection hydraulic stand-alone coolant pump, refrigeration, plumbing requirements: cleaning, removing sedimentation tank, debris cooling; circulation lines, stable and generous. Drill string scrubbing every single point of the hydraulic stand-alone machine, the exterior is covered and maintained, and the external missing parts are checked. Operating system requirements: clean, no grease, no rust, no yellow, shield and missing parts cleaning.
Scrub the hydraulic single-line axle box piercing machine to adjust the oil filter, check the fork shaft, screw, clutch cover, strap, Correa. Requirements: Check the cleanliness of the oil filter, without oil filter cap; loosen the screw to adjust the speed, adjust the brake sensitivity; and the clutch friction and belt tension should be properly scaled.
Wheel washing box gear bushing. Drilling and maintenance of aluminum formwork cleaning requirements: clean, well-leveled. Drill string, disassembly and wash 1 hydraulic single machine size sliding knife, knife, screw, nut, table, iron skew adjustment. Requirements, clean, iron-free sliding surface burrs, the size of the frame with bolts and nuts, cleaning operations. The hydraulic single seat cover of the drill string is simple and the rod is clean. Requirements: cleaning head and lead screw.







