Single-Side Bracket Supporting Bracket for Subways Tunnels Walls
In order to speed up the construction progress, save the construction period, and reduce the workload of the tower crane equipment, combined with the actual situation of the project, the beam and floor slab formwork are installed as a whole; the aluminum alloy formwork support system adopts the quick disassembly construction technology; the formwork and its supporting materials are horizontally transferred The use of manual transportation reduces the workload of the tower crane.
Product Introduction
We continue to develop, and take the responsibility of providing high-performance, high-quality, and high-efficiency Aluminium Shuttering Formwork, Snap Ties Concrete forms, Rod Tie Aluminum Formwork System as our mission. We will uphold the spirit of pioneering and innovation, provide customers with better services and realize their dreams. Our company has a technical team with high skills and years of accumulated work experience.
In order to speed up the construction progress, save the construction period, and reduce the workload of the tower crane equipment, combined with the actual situation of the project, the beam and floor slab formwork are installed as a whole; the aluminum alloy formwork support system adopts the quick disassembly construction technology; the formwork and its supporting materials are horizontally transferred The use of manual transportation reduces the workload of the tower crane.
The main construction sequence is as follows: leveling the structure, brushing the formwork release agent, formwork line-out, installation, positioning, straightening, beam and slab formwork installation; beam and slab formwork removal after concrete pouring; manual transfer to the next bid section through the loading port.
Aluminum alloy template installation
Acceptance and placement of aluminum alloy formwork materials.
1) After unloading, the template must be stacked according to specifications and dimensions. Divide the templates into a pile of 25 and place them on a shelf or pallet.
2) The templates should be stacked neatly according to the number for easy identification.
3). When stacking templates, make sure that the first template board at the bottom faces upwards.
4) All components such as pins, wedges, wall mold connectors, and special tools should be properly stored and distributed when needed.


We mainly manage all kinds of Single-Side Bracket Supporting Bracket for Subways Tunnels Walls, with novel design and advanced technology, which have won the trust and praise of our customers. We attach importance to the progress and development of technology, and continue to strengthen the scientific and technological team to meet the various requirements of customers, and our products have reached the international level. Our company has a good development thanks to the support and cooperation of friends from all walks of life. We innovate the development of institutional mechanisms and broaden a variety of financing channels through the capital market.
Hot Tags: easy disassembly tunnel formwork, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Villa Aluminum Formwork System, Detached Villa Formwork, Column formwork, Concrete Slab Desk formwork, Long Pin for Drop Head, Aluminium Shuttering Formwork
You Might Also Like
- 
   Manufacturer Formwork Drop Forged Steel Tie Rod 
- 
   Tecon Reusable Plastic Round Column Concrete Formwork 
- 
   Manufacture ISO Approved Steel Zulin China Doka Clim... 
- 
   Plastic Formwork, Construction Formwork, Modularity ... 
- 
   Metal Pressed Scaffolding Formworks Coupler Clip For... 
- 
   Butterfly Concrete Form Flat Ties Stop Wing Nuts 