
Scaffolding Square Round Anchor Formwork Scaffold Construction Drop Forged Casted Plated Tie Rod Casting Ductile Iron Wing Swivel Nut
The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).
Product Introduction
We are able to continue to improve our services and Pin and Wedge, High Rise Tower Building Formwork, Aluminum Formwork Accessories to support our growing customer base while saving costs. The production cycle of products is getting shorter and shorter, and users have higher requirements for product diversification and punctuality of product delivery. We take pride in our quick, friendly and knowledgeable service and are dedicated to assuring that you are more than just a satisfied customer. The company strives to substantially increase its market share, further enrich and improve its products, and continuously enhance the company's value. They're going to make their finest effort to meet buyers need.
1. Strong overall stability
The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).
2. Early demolition technology, flexible and fast construction
Incorporating early disassembly techniques into the design reduces material and construction costs. Each building on site uses a master formwork system, three sets of floor supports and three sets of beam supports (four sets of cantilever structure), and the construction speed of one floor can be up to five days. When the concrete strength of this layer reaches the required level, it is removed and transferred to the upper layer. A support system (including heads and rods removed earlier) at the bottom of the floor and beams was used on each of the four floors to ensure design strength was achieved, which was then removed and used on the upper floors.
3. Factory construction is faster
Realize factory construction. In the project preparation stage, the manufacturer carries out in-depth design according to the construction drawing, and then sends it to the construction site after trial assembly in the factory. All possible problems are solved in advance, greatly improving speed and accuracy.


With the honest corporate philosophy and the excellent quality of our Scaffolding Square Round Anchor Formwork Scaffold Construction Drop Forged Casted Plated Tie Rod Casting Ductile Iron Wing Swivel Nut, we have established a good reputation in the industry and gained praise and trust from the majority of customers. By establishing and improving human resource management mechanism, career development incentive mechanism, and perfect training mechanism, we are committed to become a career development booster for our employees. We will continue to carry forward the entrepreneurial spirit of 'pioneering, enterprising, loyal and trustworthy', and create more wealth for the company and society in future cooperation!
Hot Tags: rod tie aluminum formwork system, China, suppliers, manufacturers, cheap, quotation, low price, in stock, New House Building Formwork System, Flat Tie Concrete Modular, Detached Villa Formwork, Flat Tie Aluminum Formwork System, Steel Prop for Slab Formwork, Villa Aluminum Formwork
You Might Also Like
- 
   Slab Formwork Support Ajustable Shoring Props Steel ... 
- 
   Flat Rooftop Modular Guardrail with Inclined Upright 
- 
   1200kg Shuttering Magnets Precast Products Aluminum ... 
- 
   Aluminium Alloy Manual Louver Shutter 
- 
   Italian Type Pipe and Fittings Metal Scaffolding Mod... 
- 
   Aluminium Formwork Panel Building Material for Const... 

