
Metallic Steel Construction Hangar Shed
The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.
Product Introduction
Our performance advanced equipment and exquisite manufacturing process ensure that the quality of our Column formwork, Column Construction formwork Mold, Flat Tie Concrete Modular tend to be perfect. Our company will take the innovation as the duty, in line with the management idea that quality is productivity, strive to improve product quality and increase product development. We integrate all our advantages to continuously innovate, improve and optimize our industrial structure and product performance.
The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.
Tensile tests are carried out on each batch of high strength manganese steel to ensure that it can withstand a tensile force greater than 28kN.
Flat tie does not need to open holes on the panel, just milling grooves on the side ribs, and connecting the two forms with installation pins at the joint position. After the concrete has set, the aluminum formwork of the wall is removed, leaving a strip with two ends sticking out. Remove and extend the bow tie




Installation drawing

Schematic diagram (3)

It is designed as a v-shaped structure with stress concentration, and the fracture part is 5mm inside the wall, so there is no need to worry about the influence on the subsequent decoration process.


The distance between the base and the ground should not be greater than 200mm. A flat tie layout should be dense and sparse. Both sides are pressed flat with square holes to ensure flatness and hollow rectangular steel tubes.


The outer wall is provided with three square grooves, the third is arranged at the top K plate position. Install a small diagonal brace at the bottom to ensure a vertical installation. Sloping roof, top set wire rope, adjust verticality. Exterior walls are backed to prevent tilting.





In the design and development of Metallic Steel Construction Hangar Shed, we have unique technical ideas and mature development programs, and successfully provide high-quality solutions for many customers at home and abroad. Guided by the transformation and upgrading strategy and the principle of 'seeking good in stability, excellence in stability and progress in stability', we further innovate business model. We provide better product cost performance, faster response speed and more professional value-added services than our competitors.
Hot Tags: flat tie concrete modular, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Columns Aluminum Formwork, Flat Tie Aluminum Formwork System, Flat Tie Concrete Modular, Rod Tie formwork System, Easy Disassembly Tunnel Formwork, Adjustable Prop
You Might Also Like
- 
   Slab Formwork Support Adjustable Steel Shoring Prop 
- 
   Acrow Slab Table Formwork Construction Scaffolding J... 
- 
   Concrete Formwork Slab Supporting Telescopic Steel S... 
- 
   Materials Slab Table Formwork for Building Anchor Nu... 
- 
   Cheap Prefabricated Framed Light Steel Structure Fac... 
- 
   China Aluminium Concrete Formwork for Wall and Slab 

