In order to speed up the construction progress, save the construction period, and reduce the workload of the tower crane equipment, combined with the actual situation of the project, the beam and floor slab formwork are installed as a whole; the aluminum alloy formwork support system adopts the quick disassembly construction technology; the formwork and its supporting materials are horizontally transferred The use of manual transportation reduces the workload of the tower crane.
Product Introduction
We give full play to the cooperation ability of the team, pursue sustainable management and create high-quality Beam Panel Aluminum Formwork, Aluminium Shuttering Formwork, Table formwork. We hope to make employees comfortable and happy to live and work among them, trust each other, support each other and help each other. We always take high reliability, high technology and high quality as our basic business philosophy. Talent is the key to the success of the enterprise, is the first resource for the development of the enterprise, excellent talent is the bridge between strategy and implementation, is the prerequisite for the development of the enterprise.
In order to speed up the construction progress, save the construction period, and reduce the workload of the tower crane equipment, combined with the actual situation of the project, the beam and floor slab formwork are installed as a whole; the aluminum alloy formwork support system adopts the quick disassembly construction technology; the formwork and its supporting materials are horizontally transferred The use of manual transportation reduces the workload of the tower crane.
The main construction sequence is as follows: leveling the structure, brushing the formwork release agent, formwork line-out, installation, positioning, straightening, beam and slab formwork installation; beam and slab formwork removal after concrete pouring; manual transfer to the next bid section through the loading port.
Aluminum alloy template installation
Acceptance and placement of aluminum alloy formwork materials.
1) After unloading, the template must be stacked according to specifications and dimensions. Divide the templates into a pile of 25 and place them on a shelf or pallet.
2) The templates should be stacked neatly according to the number for easy identification.
3). When stacking templates, make sure that the first template board at the bottom faces upwards.
4) All components such as pins, wedges, wall mold connectors, and special tools should be properly stored and distributed when needed.


Sticking for the basic principle of 'Super Top quality, Satisfactory service', We've been striving to be an excellent business enterprise partner of you for Lianggong Single-Side Bracket for Single-Side Walls Tunnel Construction. We take a top -of-the-line international technology and adopt the efficient business model, focusing on continuous optimization and innovation of our products. We believe that our employees' aspiration for a better life is the goal of our management.
Hot Tags: easy disassembly tunnel formwork, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Flat Tie formwork System, Long Pin for Drop Head, Formwork Accessory for Casting Construction, Concrete Slab Desk formwork, Villa Aluminum Formwork, Aluminum Formwork System
You Might Also Like
- 
   Table Formwork for Slab Concrete Construction 
- 
   Safe Durable Galvanized Formwork Thread Tie Rod 
- 
   Construction Shuttering Formwork, Aluminium Concrete... 
- 
   Wholesale Steel Fence Post Black Bitumen (10 Piece B... 
- 
   Tecon Shoring Tower Construction Scaffolding for Hig... 
- 
   Lianggong Anchor Plate Formwork Accessory for Buildi... 