Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
The level measurement is based on T.B.M (temporary level base point).
The measurement records shall be archived and kept by the designated supervisor.

Product Introduction

Our company has strong technical strength and strong manufacturing capacity, and is the scientific and technological pioneer and manufacturing force of Pin and Wedge for Formwork, Mold Concrete Steel Concrete forms Ties, Beam Panel Aluminum Formwork industry. Our products always received high recognition and good reputation from customers all over the world. Following'pure and concise design style and strict manufacturing standard 'is our unchangeable operation principle, and 'science and technology leading, high quality and efficiency, customers first, keep faith and observe Contract' is our service tenet for future. We are a leading corporation that committed to innovation and technology with businesses spanning the globe.

Level measurement

1) Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.

2) The level measurement is based on T.B.M (temporary level base point).

3) The measurement records shall be archived and kept by the designated supervisor.

4) When measuring, drawing positive (+) or negative (-) on the floor to mark the measurement result is an effective method.

5) Where the elevation along the wall line exceeds the design elevation by 10mm, it should be turned to no more than 10mm. Where the wall line is lower than the reference point, plywood or wood should be used to fill the template to the required level. The corners and low places in the walls must be fully filled.

6) After the concrete is poured, the top of the starting board (K board) outside the flat mold needs to be measured horizontally. The levelness of the starting board (K board) on the outside of the flat mold will cause the structure to deviate from the center line, otherwise the template cannot maintain its sag.

7) In order to facilitate adjustment of the starting board (K board) outside the flat mold after pouring, a 26mm long hole is opened.

8) Same as the level measurement of concrete surface, the measurement records of the starting board (K board) on the periphery of the flat form shall also be archived by the designated supervisor. At the same time, deviation detection should be performed and recorded and archived


Pay off

1). The error of the wall template line should be controlled within 1mm, and a control line should be placed in parallel in the same direction 150mm from the outside of the template line.

2) The stake-out line should pass through the opening, external angle, etc. at least 150mm to facilitate the control of the correct position of the template before pouring.

3) The reference point and the stakeout point are very important, which directly affect the verticality of the wall, and it is strictly forbidden to move or damage them.

Formwork detail 1formwork detail 2

We continue to develop and design superior quality products for both our old and new customers and achieve a win-win prospect for our clients as well as us for Lianggong Hot Sale Reusable Adjustable ABS Column Wall Slab Plastic Formwork Plastic Moulds for Bridges. We are always making unremitting efforts, and are willing to grasp the future with colleagues from all walks of life at home and abroad and create brilliance together. Our company has a group of technical backbones with many years of practical experience, and we rely on technology to continuously innovate and make progress.

Hot Tags: column construction formwork mold, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Column formwork, Villa Aluminum Formwork System, High Rise Tower Building Formwork, Pin and Wedge for Formwork, Long Pin for Drop Head, Flat Tie Building Construction formwork

You Might Also Like