Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
The level measurement is based on T.B.M (temporary level base point).
The measurement records shall be archived and kept by the designated supervisor.

Product Introduction

We are committed to becoming the number one national brand in Hotel Building Aluminum Formwork, High Rise Tower Building Formwork, New House Building Formwork System industry, and always adhere to the product strategy of 'high efficiency, energy saving, and environmental protection' and the market concept of technical marketing. We advocate the management concept of unity, cooperation and brainstorming, and promote harmony but not sameness. In terms of development, our company will adhere to the development goal of continuous research and development, adapt to the change of environment, carry out technology research and development and continuously develop the market. With strong strength and operational capabilities, the company occupies a leading position in the industry and gains the trust of more users.

Level measurement

1) Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.

2) The level measurement is based on T.B.M (temporary level base point).

3) The measurement records shall be archived and kept by the designated supervisor.

4) When measuring, drawing positive (+) or negative (-) on the floor to mark the measurement result is an effective method.

5) Where the elevation along the wall line exceeds the design elevation by 10mm, it should be turned to no more than 10mm. Where the wall line is lower than the reference point, plywood or wood should be used to fill the template to the required level. The corners and low places in the walls must be fully filled.

6) After the concrete is poured, the top of the starting board (K board) outside the flat mold needs to be measured horizontally. The levelness of the starting board (K board) on the outside of the flat mold will cause the structure to deviate from the center line, otherwise the template cannot maintain its sag.

7) In order to facilitate adjustment of the starting board (K board) outside the flat mold after pouring, a 26mm long hole is opened.

8) Same as the level measurement of concrete surface, the measurement records of the starting board (K board) on the periphery of the flat form shall also be archived by the designated supervisor. At the same time, deviation detection should be performed and recorded and archived


Pay off

1). The error of the wall template line should be controlled within 1mm, and a control line should be placed in parallel in the same direction 150mm from the outside of the template line.

2) The stake-out line should pass through the opening, external angle, etc. at least 150mm to facilitate the control of the correct position of the template before pouring.

3) The reference point and the stakeout point are very important, which directly affect the verticality of the wall, and it is strictly forbidden to move or damage them.

Formwork detail 1formwork detail 2

The company is committed to providing perfect solutions to the Inflatable Rubber Core Mould for Culvert Construction industry, adhering to the business philosophy of "pursuit, derived from professionalism". We transfer the concept of corporate social responsibility to all aspects of corporate management to enhance the overall sustainable development of the company. In order to serve our customers better, we actively establish branches and offices and build strategic partnerships with our customers.

Hot Tags: column construction formwork mold, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Slab Table formwork, Flat Tie Concrete Modular, Mold Concrete Steel Concrete forms Ties, Detached Villa Formwork, Wall Panel Aluminum Formwork, Aluminium Formwork for Standard Construction

You Might Also Like