Highly Coercive Wall Product Plastic Formwork Angular Column Mould
Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
The level measurement is based on T.B.M (temporary level base point).
The measurement records shall be archived and kept by the designated supervisor.
Product Introduction
We will adhere to the spirit of'service and hard work'. Based on the business principle of'integrity and innovation', we are committed to providing Wall Panel Aluminum Formwork, Columns Aluminum Formwork, Aluminum Formwork System and services to meet the needs of different users and applications. We put product quality, work quality and service quality on the same level as human character, and take them as an important part of our staff's professional ethics education. According to this principle, we arrange each employee to a relatively suitable position according to his or her level, strengths, experience and personality, which promotes the continuous, rapid and efficient development of the company.
Level measurement
1) Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
2) The level measurement is based on T.B.M (temporary level base point).
3) The measurement records shall be archived and kept by the designated supervisor.
4) When measuring, drawing positive (+) or negative (-) on the floor to mark the measurement result is an effective method.
5) Where the elevation along the wall line exceeds the design elevation by 10mm, it should be turned to no more than 10mm. Where the wall line is lower than the reference point, plywood or wood should be used to fill the template to the required level. The corners and low places in the walls must be fully filled.
6) After the concrete is poured, the top of the starting board (K board) outside the flat mold needs to be measured horizontally. The levelness of the starting board (K board) on the outside of the flat mold will cause the structure to deviate from the center line, otherwise the template cannot maintain its sag.
7) In order to facilitate adjustment of the starting board (K board) outside the flat mold after pouring, a 26mm long hole is opened.
8) Same as the level measurement of concrete surface, the measurement records of the starting board (K board) on the periphery of the flat form shall also be archived by the designated supervisor. At the same time, deviation detection should be performed and recorded and archived
Pay off
1). The error of the wall template line should be controlled within 1mm, and a control line should be placed in parallel in the same direction 150mm from the outside of the template line.
2) The stake-out line should pass through the opening, external angle, etc. at least 150mm to facilitate the control of the correct position of the template before pouring.
3) The reference point and the stakeout point are very important, which directly affect the verticality of the wall, and it is strictly forbidden to move or damage them.


Our target should be to consolidate and enhance the top quality and service of current goods, in the meantime frequently create new products to satisfy diverse customers' calls for Highly Coercive Wall Product Plastic Formwork Angular Column Mould. Our core corporate values are, fairness, inclusiveness, pragmatism and innovation. The company adheres to the product-oriented, market-oriented, operating philosophy of honesty and trustworthiness, and users, and participates in the domestic and foreign markets with high-quality products.
Hot Tags: column construction formwork mold, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Detached Villa Formwork, Table formwork, Concrete Slab Desk formwork, Snap Ties Concrete forms, Aluminium Formwork for Standard Construction, Mold Concrete Steel Concrete forms Ties
You Might Also Like
- 
   Lianggong Building Material Steel Plank Decking Boar... 
- 
   Factory Resonable Price 10 X Star Picket Black 2400 ... 
- 
   Die Production Standard Scaffolding for Sale Safety ... 
- 
   Formwork Tie Rod with High Tensile Strength 
- 
   Tecon Concrete Shuttering Panel Aluminium Formwork F... 
- 
   Italian/Italy Type Construction Facade Scaffolding/W... 