High Quality Galvanized Carbon Steel Stainless Steel Stud Bolts DIN975 Double End Full Threaded Rod Aluminum Formwork Accessories

High Quality Galvanized Carbon Steel Stainless Steel Stud Bolts DIN975 Double End Full Threaded Rod Aluminum Formwork Accessories

The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).

Product Introduction

As a responsible manufacturer of Villa Aluminum Formwork System, New House Building Formwork System, Table formwork and a valuable partner, we have always acted in a prudent and professional manner and have built our image with concrete actions. We insist on giving top priority to the health and safety of our employees, treating every employee with respect and equality, and safeguarding and protecting all the legal rights and interests of our employees. Our technicians are well-trained and our production management system is perfect. We achieve rapid market response through a standardized and efficient process organization and system system to meet customer needs with dedication.

1. Strong overall stability

The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).


2. Early demolition technology, flexible and fast construction

Incorporating early disassembly techniques into the design reduces material and construction costs. Each building on site uses a master formwork system, three sets of floor supports and three sets of beam supports (four sets of cantilever structure), and the construction speed of one floor can be up to five days. When the concrete strength of this layer reaches the required level, it is removed and transferred to the upper layer. A support system (including heads and rods removed earlier) at the bottom of the floor and beams was used on each of the four floors to ensure design strength was achieved, which was then removed and used on the upper floors.


3. Factory construction is faster

Realize factory construction. In the project preparation stage, the manufacturer carries out in-depth design according to the construction drawing, and then sends it to the construction site after trial assembly in the factory. All possible problems are solved in advance, greatly improving speed and accuracy.


Our professional services have increased the added value of our High Quality Galvanized Carbon Steel Stainless Steel Stud Bolts DIN975 Double End Full Threaded Rod Aluminum Formwork Accessories, while winning the trust and praise of our customers. We still uphold the belief of striving to repay the society, and continue to work hard to promote intelligent life, green ecological cycle and benefit the society. We can make personalized processing according to different requirements of customers, and provide customers with satisfactory services.

Hot Tags: rod tie aluminum formwork system, China, suppliers, manufacturers, cheap, quotation, low price, in stock, New House Building Formwork System, Detached Villa Formwork, Quick Deck Slab Formwork, Aluminum Formwork Accessories, Aluminum Formwork, Easy Disassembly Tunnel Formwork

You Might Also Like