
High Quality Aluminum Alloy 6061 T6 Construction Template for Formwork
The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).
Product Introduction
We insist on strengthening the construction and management of the enterprise with the spirit of innovation. We track the advanced technology in the Steel Prop for Slab Formwork, Flat Tie Aluminum Formwork System, Aluminum Formwork industry, continuously carry out technological innovation, and devote ourselves to the goal of jointly improving the benefits of the whole value chain and related stakeholders of the enterprise, customers and suppliers. Our staff with passion, dedication and professionalism to meet the challenges of every product innovation. We sincerely look forward to cooperating with more domestic and foreign customers for a win-win situation and create a better future! The company relies on technological progress, guarantees the quality of maintenance, and continuously optimizes its product and service structure.The company relies on technological progress, guarantees the quality of mainteThe company relies on technological progress, guarantees the quality of maintenance, and continuously optimizes its product and service structure.nance, and continuously optimizes its product and service structure.
1. Strong overall stability
The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).
2. Early demolition technology, flexible and fast construction
Incorporating early disassembly techniques into the design reduces material and construction costs. Each building on site uses a master formwork system, three sets of floor supports and three sets of beam supports (four sets of cantilever structure), and the construction speed of one floor can be up to five days. When the concrete strength of this layer reaches the required level, it is removed and transferred to the upper layer. A support system (including heads and rods removed earlier) at the bottom of the floor and beams was used on each of the four floors to ensure design strength was achieved, which was then removed and used on the upper floors.
3. Factory construction is faster
Realize factory construction. In the project preparation stage, the manufacturer carries out in-depth design according to the construction drawing, and then sends it to the construction site after trial assembly in the factory. All possible problems are solved in advance, greatly improving speed and accuracy.


We persistently pursue perfect quality and use our unremitting efforts to become a trusted partner of High Quality Aluminum Alloy 6061 T6 Construction Template for Formwork for customers! Holding quality first, insisting on service first--we invested in the construction of a finishing production line, and cultivated a skilled and stable production and quality management team. We will be customer-centric, continue to innovate, and strive to become the leader of a modern enterprise.
Hot Tags: rod tie aluminum formwork system, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Long Pin for Drop Head, Pin and Wedge for Formwork, Residential Buildings Formwork, Flat Tie Building Construction formwork, Townhouse Villa Aluminum Formwork, Struture Decking Concrete Slab
You Might Also Like
- 
   Concrete Shoring Formwork Table Form Construction Fo... 
- 
   Aluminium Formwork Aluminium Formwork Profiles 
- 
   Aluminium Formwork System Made in China 
- 
   Customized Construction Equipment Tools Side Bracket... 
- 
   B9 Form Tie B9 Cone Construction Form Tie Formwork S... 
- 
   Constuction Steel Beam System Aluminium Aluform Best... 

