Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
The level measurement is based on T.B.M (temporary level base point).
The measurement records shall be archived and kept by the designated supervisor.
Product Introduction
We follow the concept of environmental symbiosis and are committed to the development, production and sales of green Table formwork, Rod Tie formwork System, Round Column formwork. Enterprise goals reveal and guide our company's future development strategy and direction. We will always do our best to reach higher goals and each employee will be challenged to achieve the best quality. We promote the technological progress and scientific innovation of our company based on the importance of basic research and application. We actively create a corporate environment with harmonious external connections and strict internal control to provide inexhaustible momentum for the company's forward movement.
Level measurement
1) Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
2) The level measurement is based on T.B.M (temporary level base point).
3) The measurement records shall be archived and kept by the designated supervisor.
4) When measuring, drawing positive (+) or negative (-) on the floor to mark the measurement result is an effective method.
5) Where the elevation along the wall line exceeds the design elevation by 10mm, it should be turned to no more than 10mm. Where the wall line is lower than the reference point, plywood or wood should be used to fill the template to the required level. The corners and low places in the walls must be fully filled.
6) After the concrete is poured, the top of the starting board (K board) outside the flat mold needs to be measured horizontally. The levelness of the starting board (K board) on the outside of the flat mold will cause the structure to deviate from the center line, otherwise the template cannot maintain its sag.
7) In order to facilitate adjustment of the starting board (K board) outside the flat mold after pouring, a 26mm long hole is opened.
8) Same as the level measurement of concrete surface, the measurement records of the starting board (K board) on the periphery of the flat form shall also be archived by the designated supervisor. At the same time, deviation detection should be performed and recorded and archived
Pay off
1). The error of the wall template line should be controlled within 1mm, and a control line should be placed in parallel in the same direction 150mm from the outside of the template line.
2) The stake-out line should pass through the opening, external angle, etc. at least 150mm to facilitate the control of the correct position of the template before pouring.
3) The reference point and the stakeout point are very important, which directly affect the verticality of the wall, and it is strictly forbidden to move or damage them.


We are dedicated to providing reliable and cost-effective Girder Beam Steel Formwork & Circular Column Formwork for Advance Construction for There on-Going Bridge Project and value-added services, as well as striving for maximum benefit and satisfaction for our customers. We adhere to the principles of evidence, practicality and effectiveness. Our company continues to improve product quality, pre-sale and after-sales service, centralizes advantages to create leading industry and self-produced products, which has been successfully transformed over the years.
Hot Tags: column construction formwork mold, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Easy Disassembly Tunnel Formwork, Aluminum Formwork System, Column formwork, Flat Tie formwork System, Townhouse Villa Aluminum Formwork, Column Concrete Mold Formwork
You Might Also Like
- 
   Wholesale Price for Metal Aluminium Beam Formwork Sy... 
- 
   Scaffolding System Safety Protection Climbing Ladder... 
- 
   Telescopic Push-Pull Prop for Wall Formwork Support 
- 
   Lianggong Steel Climbing Cone Formwork Accessories f... 
- 
   Lianggong Accessory for Wood/Wall Formwork 
- 
   Aluminum Wall Formwork Panel (pouring concrete walls... 