
for United Arab Emirates Formwork System Galvanized Adjustalbe Clamp Formwork Column Wedge Clamp
The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).
Product Introduction
We take a rigorous attitude to integrate the spirit of safety and quality system certification in the design and manufacturing process of our Aluminium Formwork for Standard Construction, Easy Disassembly Tunnel Formwork, Rod Tie formwork System. We enhance the added value of our products, and our powerful innovative technology has realized the value transformation of cost reduction and efficiency improvement at the same time. Good faith wins customers, and quality creates trust. Our company always adheres to the business philosophy of 'science and technology as the guide, marketing as the leader, quality as the center'. Our company has experienced high-quality staff, advanced production equipment and product testing means.
1. Strong overall stability
The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).
2. Early demolition technology, flexible and fast construction
Incorporating early disassembly techniques into the design reduces material and construction costs. Each building on site uses a master formwork system, three sets of floor supports and three sets of beam supports (four sets of cantilever structure), and the construction speed of one floor can be up to five days. When the concrete strength of this layer reaches the required level, it is removed and transferred to the upper layer. A support system (including heads and rods removed earlier) at the bottom of the floor and beams was used on each of the four floors to ensure design strength was achieved, which was then removed and used on the upper floors.
3. Factory construction is faster
Realize factory construction. In the project preparation stage, the manufacturer carries out in-depth design according to the construction drawing, and then sends it to the construction site after trial assembly in the factory. All possible problems are solved in advance, greatly improving speed and accuracy.


In order to seek greater development, our company does not focus on the existing for United Arab Emirates Formwork System Galvanized Adjustalbe Clamp Formwork Column Wedge Clamp market, but actively explore new markets. We have established strategic partnerships with many colleagues to further improve the performance and quality of our products. Constant innovation is the source of our vitality.
Hot Tags: rod tie aluminum formwork system, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Flat Tie Aluminum Formwork System, Column Concrete Mold Formwork, Pin and Wedge for Formwork, Flat Tie Building Construction formwork, Rod Tie Aluminum Formwork System, Aluminium Formwork for Standard Construction






