Fire Retardant Recyclable Plastic Concrete Mould Instead of Plywood Steel Aluminium for Construction Site
Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
The level measurement is based on T.B.M (temporary level base point).
The measurement records shall be archived and kept by the designated supervisor.
Product Introduction
We continue to provide high-quality Tie Rod For Formwork, Column Concrete Mold Formwork, High Rise Tower Building Formwork and services, always pursue green and sustainable development, and actively contribute to the construction of a beautiful home for mankind. In the future, we will continue to bring together the creativity and technology we have accumulated over the years to promote social progress and light up a new future! Our enterprise spirit is the magic weapon to support us in overcoming difficulties and sustainable development. The business environment will change, the industry is also constantly changing, only the truth that if you do not advance, you will never retreat. The company's technological research and development capabilities and technological innovation capabilities maintain an advanced level in the same industry.
Level measurement
1) Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
2) The level measurement is based on T.B.M (temporary level base point).
3) The measurement records shall be archived and kept by the designated supervisor.
4) When measuring, drawing positive (+) or negative (-) on the floor to mark the measurement result is an effective method.
5) Where the elevation along the wall line exceeds the design elevation by 10mm, it should be turned to no more than 10mm. Where the wall line is lower than the reference point, plywood or wood should be used to fill the template to the required level. The corners and low places in the walls must be fully filled.
6) After the concrete is poured, the top of the starting board (K board) outside the flat mold needs to be measured horizontally. The levelness of the starting board (K board) on the outside of the flat mold will cause the structure to deviate from the center line, otherwise the template cannot maintain its sag.
7) In order to facilitate adjustment of the starting board (K board) outside the flat mold after pouring, a 26mm long hole is opened.
8) Same as the level measurement of concrete surface, the measurement records of the starting board (K board) on the periphery of the flat form shall also be archived by the designated supervisor. At the same time, deviation detection should be performed and recorded and archived
Pay off
1). The error of the wall template line should be controlled within 1mm, and a control line should be placed in parallel in the same direction 150mm from the outside of the template line.
2) The stake-out line should pass through the opening, external angle, etc. at least 150mm to facilitate the control of the correct position of the template before pouring.
3) The reference point and the stakeout point are very important, which directly affect the verticality of the wall, and it is strictly forbidden to move or damage them.


With our high-quality, efficient management and innovative business philosophy, our company is unique in the Fire Retardant Recyclable Plastic Concrete Mould Instead of Plywood Steel Aluminium for Construction Site field and has a high reputation. With the development of the company, our company's product line continues to expand, we can meet the diverse needs of customers. We improve the efficiency of customer service and create greater value for customers through characteristic service.
Hot Tags: column construction formwork mold, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Column Concrete Mold Formwork, High Rise Tower Building Formwork, Slab or Deck Panel Aluminum Formwork, Column formwork, Flat Tie Building Construction formwork, Villa Aluminum Formwork System
You Might Also Like
- 
   High Quality Concrete Aluminium Formwork Accessories... 
- 
   Zulin Steel Q235 Protect System for Hish-Rise Protec... 
- 
   Online Technical Support Steel Wood Zulin China Cons... 
- 
   Lianggong Climbing Formwork for Bridge Tower 
- 
   Lightweight Steel Panel Formwork for Walls, Slabs, C... 
- 
   Stainless Steels Clevis Pin Drop Nose Pin 