Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
The level measurement is based on T.B.M (temporary level base point).
The measurement records shall be archived and kept by the designated supervisor.
Product Introduction
We adhere to the spirit of "service and hard work" and the principle of "integrity and innovation". We are committed to providing High Rise Tower Building Formwork, Column Construction formwork Mold, Round Column formwork and services to meet the needs of different users. We are committed to driving the sustainable development of the industry through our own influence. We insist on promoting the core competitiveness of enterprises with corporate culture, so as to establish a good social image in the development of enterprises. We strive to step into the new track as soon as possible. We practice our responsibility, harmony and win-win to further promote harmony and win-win between enterprises and society.
Level measurement
1) Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
2) The level measurement is based on T.B.M (temporary level base point).
3) The measurement records shall be archived and kept by the designated supervisor.
4) When measuring, drawing positive (+) or negative (-) on the floor to mark the measurement result is an effective method.
5) Where the elevation along the wall line exceeds the design elevation by 10mm, it should be turned to no more than 10mm. Where the wall line is lower than the reference point, plywood or wood should be used to fill the template to the required level. The corners and low places in the walls must be fully filled.
6) After the concrete is poured, the top of the starting board (K board) outside the flat mold needs to be measured horizontally. The levelness of the starting board (K board) on the outside of the flat mold will cause the structure to deviate from the center line, otherwise the template cannot maintain its sag.
7) In order to facilitate adjustment of the starting board (K board) outside the flat mold after pouring, a 26mm long hole is opened.
8) Same as the level measurement of concrete surface, the measurement records of the starting board (K board) on the periphery of the flat form shall also be archived by the designated supervisor. At the same time, deviation detection should be performed and recorded and archived
Pay off
1). The error of the wall template line should be controlled within 1mm, and a control line should be placed in parallel in the same direction 150mm from the outside of the template line.
2) The stake-out line should pass through the opening, external angle, etc. at least 150mm to facilitate the control of the correct position of the template before pouring.
3) The reference point and the stakeout point are very important, which directly affect the verticality of the wall, and it is strictly forbidden to move or damage them.


We provide our customers with safe and long-lasting high-performance Ecomomical Plastic Concrete Mould Formwork Shuttering PP Board for Building Construction Site with the most stringent production process and quality control management. Our tenet is independent innovation, brand supremacy, customer satisfaction and self realization. We aim for a harmonious win-win situation to further realize the common development and shared results of relevant stakeholders.
Hot Tags: column construction formwork mold, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Long Pin for Drop Head, Struture Decking Concrete Slab, Slab Table formwork, Snap Ties Concrete forms, Pin and Wedge, High Rise Residential Buildings Formwork
You Might Also Like
- 
   Prefabricated Steel Structure Warehouse (BYSS-015) 
- 
   Modular Aluminium Concrete Formwork System for Build... 
- 
   Lightweight Steel Panel Formwork for Walls, Slabs, C... 
- 
   PP Disposable Formwork for Pool Deck Slab Filling 
- 
   Stripping Formwork Slab Shoring Tecon Formwork Table... 
- 
   Lianggong Flange Nut as Formwork Accessory Used by D... 