Dragon Scaffolding Clamps Tie Rod Scaffold_Spanner in India

Dragon Scaffolding Clamps Tie Rod Scaffold_Spanner in India

The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).

Product Introduction

We have been pursuing high-quality, cost-effective and highly interchangeable High Rise Tower Building Formwork, Adjustable Prop, Rod Tie Aluminum Formwork System to serve the global users. We perfectly integrate R&D and art, based on high-quality products, to create the ultimate products. We try our best to improve the innovation ability and production capacity of our products, base ourselves on the domestic market with high-quality products and actively explore the foreign market and strive to make our company a well-known brand. We meet the all-round requirements of our customers with excellent quality and value-added services, respecting our customers, employees, society and natural environment.

1. Strong overall stability

The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).


2. Early demolition technology, flexible and fast construction

Incorporating early disassembly techniques into the design reduces material and construction costs. Each building on site uses a master formwork system, three sets of floor supports and three sets of beam supports (four sets of cantilever structure), and the construction speed of one floor can be up to five days. When the concrete strength of this layer reaches the required level, it is removed and transferred to the upper layer. A support system (including heads and rods removed earlier) at the bottom of the floor and beams was used on each of the four floors to ensure design strength was achieved, which was then removed and used on the upper floors.


3. Factory construction is faster

Realize factory construction. In the project preparation stage, the manufacturer carries out in-depth design according to the construction drawing, and then sends it to the construction site after trial assembly in the factory. All possible problems are solved in advance, greatly improving speed and accuracy.


We always follow efficient management and strict production standards and therefore produce first-class quality Dragon Scaffolding Clamps Tie Rod Scaffold_Spanner in India. We've been convinced that with joint efforts, the enterprise between us will bring us mutual benefits. They are widely favored by customers at home and abroad.

Hot Tags: rod tie aluminum formwork system, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Pin and Wedge for Formwork, Residential Buildings Formwork, Flat Tie Building Construction formwork, Villa Aluminum Formwork System, Quick Deck Slab Formwork, Aluminium Formwork for Standard Construction

You Might Also Like