Construction Steel Formwork U Fork Head

Construction Steel Formwork U Fork Head

The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).

Product Introduction

Our company has always been committed to providing Chinese families with comfortable, environmentally friendly and cost-effective Concrete Slab Desk formwork, Flat Tie Concrete Modular, Aluminum Formwork Accessories one-stop solutions with the mission of "creating a comfortable life with wisdom" and the vision of "creating a national brand with an international perspective". We also provide OEM service that caters to your specific needs and requirements. We have a professional enterprising spirit, continuous learning, craftsmanship to hone skills and provide perfect results.

1. Strong overall stability

The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).


2. Early demolition technology, flexible and fast construction

Incorporating early disassembly techniques into the design reduces material and construction costs. Each building on site uses a master formwork system, three sets of floor supports and three sets of beam supports (four sets of cantilever structure), and the construction speed of one floor can be up to five days. When the concrete strength of this layer reaches the required level, it is removed and transferred to the upper layer. A support system (including heads and rods removed earlier) at the bottom of the floor and beams was used on each of the four floors to ensure design strength was achieved, which was then removed and used on the upper floors.


3. Factory construction is faster

Realize factory construction. In the project preparation stage, the manufacturer carries out in-depth design according to the construction drawing, and then sends it to the construction site after trial assembly in the factory. All possible problems are solved in advance, greatly improving speed and accuracy.


Through continuous research and development of new technology, through a thorough understanding of customer needs, through the fine operation of the internal management system, we produce high-quality Construction Steel Formwork U Fork Head. As the industry tells the development, we will continue to pursue the business philosophy of technological innovation, exquisite quality and quality of service. We grow in development, grow in growth, and are committed to becoming a well-known company with a high reputation.

Hot Tags: rod tie aluminum formwork system, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Quick Deck Slab Formwork, Column Construction formwork Mold, Long Pin for Drop Head, Snap Ties Concrete forms, Residential Buildings Formwork, Lightweight Aluminum Formwork

You Might Also Like