
Construction Concrete Steel Aluminium Plastic Formwork System Tie Rod Wing Nut
The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).
Product Introduction
More and more of our Concrete Slab Desk formwork, Adjustable Prop, Aluminium Formwork for Standard Construction are integrated into the international elements, with a view to marketing around the world and expanding overseas markets. The company has offices all over the country with professional, high-quality, and strong communication skills after-sales service personnel to provide you with high-quality products and efficient services. Enhancing the brand image is a long-term campaign, we will always adhere to and never relax. We believe that the development of enterprises should be people-oriented, to achieve the progress and growth of employees and enterprises together. We have entered into the international market and kept long-term cooperative relations with many famous international companies. We always carry out the enterprise spirit of 'Perseverance and Attentive Service', and wholeheartedly provide good products and satisfactory services to new and old customers at home and abroad.
1. Strong overall stability
The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).
2. Early demolition technology, flexible and fast construction
Incorporating early disassembly techniques into the design reduces material and construction costs. Each building on site uses a master formwork system, three sets of floor supports and three sets of beam supports (four sets of cantilever structure), and the construction speed of one floor can be up to five days. When the concrete strength of this layer reaches the required level, it is removed and transferred to the upper layer. A support system (including heads and rods removed earlier) at the bottom of the floor and beams was used on each of the four floors to ensure design strength was achieved, which was then removed and used on the upper floors.
3. Factory construction is faster
Realize factory construction. In the project preparation stage, the manufacturer carries out in-depth design according to the construction drawing, and then sends it to the construction site after trial assembly in the factory. All possible problems are solved in advance, greatly improving speed and accuracy.


We have a perfect quality control system and the concept of sincere service, our Construction Concrete Steel Aluminium Plastic Formwork System Tie Rod Wing Nut are popular. We constantly improve the service level, create a magic stone with our own characteristics, form an integrated mode of customer service. Based on the tenet of "unity, hard work, enterprising, and development", we will move towards the goal of big market, big logistics, big capital, and big brand.
Hot Tags: rod tie aluminum formwork system, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Rod Tie Aluminum Formwork System, Slab or Deck Panel Aluminum Formwork, High Rise Tower Building Formwork, Concrete Slab Desk formwork, Flat Tie Concrete Modular, High Rise Residential Buildings Formwork
You Might Also Like
- 
   Zolo TF20 Table Formwork for Slab Concrete 
- 
   Aluminum Formwork Concret System for Construction 
- 
   Heavy Duty Adjustable Steel Scaffolding Prop 
- 
   High Quality Wall Plastic Formwork for Construction 
- 
   1500kg Shuttering Magnets Precast Products Aluminum ... 
- 
   New Design Fabricated Modular Modern Mobile Prefabri... 

