Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
The level measurement is based on T.B.M (temporary level base point).
The measurement records shall be archived and kept by the designated supervisor.
Product Introduction
Our company advocates the concept of science and technology, and abides by the tenet of customer first and reputation first, providing customers with favorable and high quality Wall Panel Aluminum Formwork, Lightweight Aluminum Formwork, Aluminium Shuttering Formwork in a timely manner. Our business strategy is committed to cooperative development, specialized production and standardized operation. In the face of opportunities and challenges, we will continue to explore, and we are willing to walk with all our partners all the way. We welcome friends in different fields to visit our company and discuss business. We are always following our enterprise culture : 'To offer service with faith and credit, To be stronger by continuous improvement'. All staff of our company are constantly forging ahead, carrying forward the spirit of 'pragmatic innovation, integrity, service, harmony and win-win'.
Level measurement
1) Before assembling the formwork, measure the elevation level of the concrete floor at the assembly position.
2) The level measurement is based on T.B.M (temporary level base point).
3) The measurement records shall be archived and kept by the designated supervisor.
4) When measuring, drawing positive (+) or negative (-) on the floor to mark the measurement result is an effective method.
5) Where the elevation along the wall line exceeds the design elevation by 10mm, it should be turned to no more than 10mm. Where the wall line is lower than the reference point, plywood or wood should be used to fill the template to the required level. The corners and low places in the walls must be fully filled.
6) After the concrete is poured, the top of the starting board (K board) outside the flat mold needs to be measured horizontally. The levelness of the starting board (K board) on the outside of the flat mold will cause the structure to deviate from the center line, otherwise the template cannot maintain its sag.
7) In order to facilitate adjustment of the starting board (K board) outside the flat mold after pouring, a 26mm long hole is opened.
8) Same as the level measurement of concrete surface, the measurement records of the starting board (K board) on the periphery of the flat form shall also be archived by the designated supervisor. At the same time, deviation detection should be performed and recorded and archived
Pay off
1). The error of the wall template line should be controlled within 1mm, and a control line should be placed in parallel in the same direction 150mm from the outside of the template line.
2) The stake-out line should pass through the opening, external angle, etc. at least 150mm to facilitate the control of the correct position of the template before pouring.
3) The reference point and the stakeout point are very important, which directly affect the verticality of the wall, and it is strictly forbidden to move or damage them.


Since the establishment of our company, we have taken the promotion of national industries as our own responsibility and our goal is to become a leading provider of China Manufacturer Customized Adjustable Modular Metal Formwork for Wall/Slab/Column Construction in China. Our company's corporate culture construction draws rich nutrients from our excellent historical and cultural traditions, and actively innovates in content and form. In daily production management, the company strictly operates in accordance with ISO9000 standards. Strict quality control runs through the entire production process and goes deep into every detail, so that the quality of the manufactured products meets the relevant domestic and international standards.
Hot Tags: column construction formwork mold, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Beam Panel Aluminum Formwork, Rod Tie Aluminum Formwork System, Snap Ties Concrete forms, Adjustable Prop, Struture Decking Concrete Slab, Wall Panel Aluminum Formwork
You Might Also Like
- 
   Adjustable Steel Props for Slab Formwork Constructio... 
- 
   Scaffolding Adjustable Steel Prop Formwork Props for... 
- 
   Dw Hot Rolled Tie Rod for Formwork Tie Backs 
- 
   High Quality Ringlock Stair Tower for High-Rise Buil... 
- 
   China Manufacturer Customized Adjustable Modular Ste... 
- 
   High Quality Wall Plastic Formwork for Construction 