Central America Prefab House Steel Structure Storage Shed Steel Warehouse
The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.
Product Introduction
Our company adopts advanced production technology and complete quality management system to ensure Beam Panel Aluminum Formwork, Wall Panel Aluminum Formwork, Pin and Wedge for Formwork quality. We need to unite and cooperate, and constantly exceed the organizational structure and geographic restrictions to meet the ever-changing needs of customers. Our company adopts high technology and large-scale production, so we can satisfy every customer with reasonable price, stable quality and on-time delivery.
The flat tie rod is a thin steel plate whose length is determined by the thickness of the pilaster and is 2mm. During concrete construction, aluminum molds on both sides can be tightly "pulled" to prevent expansion and explosion of products during construction and ensure construction quality.
Tensile tests are carried out on each batch of high strength manganese steel to ensure that it can withstand a tensile force greater than 28kN.
Flat tie does not need to open holes on the panel, just milling grooves on the side ribs, and connecting the two forms with installation pins at the joint position. After the concrete has set, the aluminum formwork of the wall is removed, leaving a strip with two ends sticking out. Remove and extend the bow tie




Installation drawing

Schematic diagram (3)

It is designed as a v-shaped structure with stress concentration, and the fracture part is 5mm inside the wall, so there is no need to worry about the influence on the subsequent decoration process.


The distance between the base and the ground should not be greater than 200mm. A flat tie layout should be dense and sparse. Both sides are pressed flat with square holes to ensure flatness and hollow rectangular steel tubes.


The outer wall is provided with three square grooves, the third is arranged at the top K plate position. Install a small diagonal brace at the bottom to ensure a vertical installation. Sloping roof, top set wire rope, adjust verticality. Exterior walls are backed to prevent tilting.





We adhere to the system innovation and product structure optimization, combined with international innovation technology, and spare no effort in the R & D and manufacturing of high-quality Central America Prefab House Steel Structure Storage Shed Steel Warehouse. We are clear that only competition can make progress and allow us to constantly surpass ourselves and our competitors. We have made groundbreaking breakthroughs in research and development, and obtained independent intellectual property rights for related technologies and key components.
Hot Tags: flat tie concrete modular, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Beam Panel Aluminum Formwork, Aluminum Formwork, Concrete Slab Desk formwork, Hotel Building Aluminum Formwork, Aluminum Formwork Accessories, Column formwork
You Might Also Like
- 
   Adjustable Steel Props for Slab Formwork Constructio... 
- 
   Building Galvanizd Scaffold Push Pull Heavy Light Du... 
- 
   Zulin Modular Flat Wooden Table Shuttering Formwork ... 
- 
   Concrete Formwork Adjustable Dw15/17 Tie Rod 
- 
   Top Sale Formwork Wing Nut and Formwork Steel Tie Ro... 
- 
   Formwork Tie Rod Steel Water Stop Metal Casting 