
Aluminum Concrete Form Threaded Rod Tie Nut and Wing Nut
The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).
Product Introduction
Continuously improve the quality of Rod Tie Aluminum Formwork System, Villa Aluminum Formwork, Flat Tie Aluminum Formwork System to meet the needs of customers to the greatest extent is our pursuit as always. We are a comprehensive, scientific and technological enterprise integrating R & D and production. With our strong manufacturing partners capabilities, we create a 'One Stop' solution for our customers. By studying and developing new techniques, we are not only following but also leading fashion industry. We have established an efficient after-sales service system, and have achieved standardization and large-scale production, which greatly reduces costs and improves the competitive advantage for the company and customers.
1. Strong overall stability
The aluminum mold system integrates the wall mold, top mold, bracket and so on organically in one pouring concrete. One-time assembly and concrete pouring, the overall stability of the structure is very good (pouring in stages according to the site conditions).
2. Early demolition technology, flexible and fast construction
Incorporating early disassembly techniques into the design reduces material and construction costs. Each building on site uses a master formwork system, three sets of floor supports and three sets of beam supports (four sets of cantilever structure), and the construction speed of one floor can be up to five days. When the concrete strength of this layer reaches the required level, it is removed and transferred to the upper layer. A support system (including heads and rods removed earlier) at the bottom of the floor and beams was used on each of the four floors to ensure design strength was achieved, which was then removed and used on the upper floors.
3. Factory construction is faster
Realize factory construction. In the project preparation stage, the manufacturer carries out in-depth design according to the construction drawing, and then sends it to the construction site after trial assembly in the factory. All possible problems are solved in advance, greatly improving speed and accuracy.


Since its establishment, the company has consistently adhered to the theory of 'science and technology is the primary productive force' as its guide, and has launched various high-quality Aluminum Concrete Form Threaded Rod Tie Nut and Wing Nut with perfect technology and diligent pursuit of quality. In the long-term business development process, we continue to deepen the reform and progress of enterprise internal management, and constantly promote the pace of global market development. We emphasize the scientific concept of development and people-oriented. In terms of corporate behavior, we are advancing with the times and creating a resource-saving and environment-friendly enterprise.
Hot Tags: rod tie aluminum formwork system, China, suppliers, manufacturers, cheap, quotation, low price, in stock, Table formwork, Snap Ties Concrete forms, Struture Decking Concrete Slab, Slab or Deck Panel Aluminum Formwork, Beam Panel Aluminum Formwork, Concrete Slab Desk formwork
You Might Also Like
- 
   Table Formwork for Slab Concrete Construction 
- 
   Safe Durable Galvanized Formwork Thread Tie Rod 
- 
   Construction Shuttering Formwork, Aluminium Concrete... 
- 
   Formwork Pin Curved Wedge and Stright Wedge with Slo... 
- 
   Retaining Wall Concrete Foundation Simple Single-Sid... 
- 
   Adjustable Customized Steel Column Wall Formwork for... 

