Aluminum Alloy Building Aluminum Formwork Construction Is Convenient And Shortens The Construction Period

Nov 07, 2024

               Aluminum alloy building   aluminium formwork construction is convenient and shortens the construction period

24-5

High strength, light weight, with a weight of only 21-25kg per square meter; Easy to construct and simple to assemble. All aluminum templates for construction can be manually disassembled, and all materials can be manually transported vertically, independent of tower cranes and unloading platforms; High efficiency, it can reach the standard layer within five days. The process adopts an early dismantling template system, and the support system generally does not require horizontal bars. The rigid connection between the support head of the vertical support rod and the template forms the door frame between the support rods. When dismantling the board, retain the support system. After the concrete strength meets the requirements, remove the support rod.