Ready the formwork first 1 stand
Sep 14, 2022
1. Transport the aluminum formworks to site and stack at the designated location
the size of the location need around 1/3 of the project
Sep 14, 2022
1. Transport the aluminum formworks to site and stack at the designated location
the size of the location need around 1/3 of the project